Kempegowda International Airport
Kempegowda International Airport (IATA: BLR, ICAO: VOBL) is an international airport serving Bangalore, the capital of Karnataka, in the southern part of India. Spread over 4,000 acres (1,600 ha), it is located about 30 kilometres (19 mi) north of the city near the suburb of Devanahalli. It is owned and operated by Bengaluru International Airport Limited (BIAL), a public–private consortium. The airport opened in May 2008 as an alternative to increased congestion at HAL Airport, the original primary commercial airport serving the city. It is named after Kempe Gowda I, the founder of Bangalore. Kempegowda International Airport became Karnataka's first fully solar powered airport developed by CleanMax Solar. The Kempegowda International Airport's 3 Letter IATA code "BLR" is Derived from Bangalore's status as Silicon Valley of India.[6][7][8][9]
Kempegowda International Airport | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||||||
![]() | |||||||||||||||
Summary | |||||||||||||||
Airport type | Public | ||||||||||||||
Owner |
| ||||||||||||||
Operator | Bengaluru International Airport Limited (BIAL) | ||||||||||||||
Serves | Bangalore | ||||||||||||||
Location | Devanahalli, Karnataka, India | ||||||||||||||
Opened | 24 May 2008 | ||||||||||||||
Hub for | |||||||||||||||
Focus city for | |||||||||||||||
Elevation AMSL | 915 m / 3,002 ft | ||||||||||||||
Coordinates | 13°12′25″N 077°42′15″E | ||||||||||||||
Website | www | ||||||||||||||
Map | |||||||||||||||
![]() ![]() BLR/VOBL ![]() ![]() BLR/VOBL BLR/VOBL (India) ![]() ![]() BLR/VOBL BLR/VOBL (South Asia) ![]() ![]() BLR/VOBL BLR/VOBL (Middle East) ![]() ![]() BLR/VOBL BLR/VOBL (Asia) | |||||||||||||||
Runways | |||||||||||||||
| |||||||||||||||
Statistics (April 2021 – March 2022) | |||||||||||||||
| |||||||||||||||
Kempegowda Airport is the third-busiest airport by passenger traffic, air traffic movements and domestic and total cargo handled in India,[10] behind the airports in Delhi and Mumbai, and is the 29th busiest airport in Asia. In the FY 2021-22, the airport handled around 16.2 million passengers and 411,550 tonnes (453,660 short tons) of cargo.
The airport has a single passenger terminal that handles both domestic and international operations, and two runways, the second of which was commissioned on 6 December 2019.[11][12] A second terminal (Phase-1) is in the final stages of construction. Also, there is a cargo village and three cargo terminals. The airport serves as a hub for AirAsia India, Alliance Air, Go First, IndiGo, Star Air and DHL Aviation[2] and is a focus city for Air India and SpiceJet. The airport was recognised as the best airport (25 to 40 million passengers per annum) in Asia-Pacific in 2020 by Airports Council International.[13]
History
Planning (1991–2004)
The original airport serving Bangalore was HAL Airport, located 5 kilometres (3.1 mi) from the city centre. It was the primary airport serving Bangalore city until 2008. Originally established in 1942 for military and defence purposes, HAL began domestic operations for the first time in the late 1970s. The unexpected popularity of the newly-offered domestic flights encouraged rapid expansion of the airport. In the late 1990s, the first international flights started.[14] Air India was the first airline to offer international flights, flying to Singapore. In 2000, the first foreign airline started operations from HAL Airport, with Royal Nepal Airlines to Kathmandu, followed by Lufthansa's A340 a year later from Germany. Several other major international carriers such as British Airways and Air France were already serving the old airport by 2005.[15]
However, as Bangalore grew into the Silicon Valley of India and passenger traffic to the city rose, HAL Airport with a single runway and limited aircraft parking space was unable to cope with this increased traffic. In 2007 it saw a footfall of 8 million passengers, more than double its original capacity of 3.6 million.[16][17] There was no room for expansion and the airport apron could only park six aircraft.[18] In March 1991, former chairman of the National Airports Authority of India (NAAI) S. Ramanathan convened a panel to select the site for a new airport. The panel decided on Devanahalli, a village about 30 kilometres (19 mi) north of Bangalore.[19][20] The State Government made a proposal to build the airport with private assistance, which the Union Government approved in 1994.[21] Finally in 1995, Airports Authority of India (AAI) and Government of Karnataka decided to call for international consortia to own, build and operate the new Greenfield airport of the city.[22]
In December 1995, a consortium of Tata Group, Raytheon and Singapore Changi Airport signed a memorandum of understanding with the State Government regarding participation in the project. In June 1998, however, the consortium announced it was pulling out of the project due to delays in government approval. These included disputes over the location of the airport and the fate of HAL Airport.[19][23]
In May 1999, the Airports Authority of India (AAI) and the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) of the State Government signed a memorandum of understanding regarding the nature of the project. It would be a public–private partnership, with AAI and KSIIDC having a 26% share and private companies having the remaining 74%.[21] In January 2001, the State Government created the company Bengaluru International Airport Limited (BIAL) as a special purpose entity and began searching for partners.[24] By November, the project had attracted Unique Zürich Airport, Siemens Project Ventures and Larsen & Toubro.[25] Construction was expected to begin in October 2002;[26] however, governmental delays persisted.[27][28] The concession agreement between the State Government, the Union Government and BIAL was signed in July 2004.[29] In it, BIAL required the closure of HAL Airport.[30]
It took nearly a decade from the initial stage of land allocation and acquisition, to signing of shareholder agreements in 2002 and until start of construction. The Government of India had already planned to privatise other airports, in the time when BIAL had to negotiate the legal framework.
During the formation of legal framework, BIAL's main observation was the unprecedented growth that aviation industry faced. BIAL now had to verify the airport capacity and take necessary steps to make the airport practical for years to come.[22]
Designing
BIAL, when the project was first designated, had anticipated traffic of approximately 5 million in the first year of operations in 2008. However, HAL Airport had handled over 8 million passengers by the time the construction of the new greenfield airport started. It was a challenge to significantly increase the project size which was already under construction without delaying the initial airport opening date. It took more than nine months to redesign the process along with gaining the necessary approvals, and, by the time the approval for increased project was sanctioned, half of the construction was complete. The project was well on track despite the challenge and was expected to be ready by its initial given open date.
The revised increased capacity project was constructed to cater to eleven million passengers per annum, up from the previous plan of 5 million passengers per annum. BIAL increased project had plans to build a terminal with eight passengers boarding bridges, one double arm aerobridge, nine remote bus gates and a runway measuring 4,000 metres with efficient taxiways. BIAL also planned to build an apron with 42 Code-C aircraft stands (with eight contact stands) as well as an air- and land-side road system. Sufficient parking space, as well as the necessary auxiliary buildings, were also included in the plan. Service providers were selected to build an aviation fuel facility, cargo warehouses, flight catering kitchens and aircraft maintenance hangars. The estimated cost for the entire project was Rs 1,930 crore (approximately US$430 million).
The new masterplan was designed with several aspects in mind, in order for it to fulfil the need for an operationally-efficient and passenger-friendly airport. The resultant design ensures that, based on passenger and cargo growth, the size and capacity of the airport can be gradually expanded. The master plan not only provides for premium land for commercial real estate developments such as office parks, retail and entertainment, but also for hospitality services. There is also land reserved for a rail link to the city.[22]
Construction and opening (2005–2008)
Construction finally commenced on 2 July 2005.[31] When a study predicted the airport would receive 6.7 million passengers in 2008, the airport was redesigned from its initial capacity of 4.5 million passengers to 11 million,[32] with the terminal size expanded and the number of aircraft stands increased. The cost of the airport rose to ₹19.3 billion (US$250 million).[33] Construction was completed in 32 months, and BIAL set the launch date for 30 March 2008.[34] However, due to delays in establishing air traffic control services at the airport, the launch date was pushed to 11 May[35] and finally 24 May 2008.[36]
As the opening date for the airport approached, public criticism arose, mainly directed toward the closure of HAL Airport. In March 2008, AAI employees conducted a massive strike against the closure of HAL Airport along with Begumpet Airport in Hyderabad, fearing they would lose their jobs.[37] The Bangalore City Connect Foundation, a group of citizens and businessmen, staged a rally in mid-May, claiming the new airport was too small for the latest demand projections.[38][39] On 23 May, a hearing was held at the Karnataka High Court over poor connectivity between the city and the airport. Ultimately, the State Government decided to go ahead with inaugurating the new airport and closing HAL Airport.[40]
The first flight to the airport, Air India Flight 609 from Mumbai, was allowed to land the previous night as it would be continuing to Singapore shortly after midnight. The aircraft touched down at 10:40 pm on 23 May.[41] The airport became the third greenfield airport under a public–private partnership to open in India, after Rajiv Gandhi International Airport in Hyderabad and Cochin International Airport.[42]
Renaming and expansion (2009–present)
The original name of the airport was Bengaluru International Airport.[43] In February 2009, the State Government sent a proposal to the Union Government to rename the airport after the founder of Bangalore, Kempe Gowda I.[44] When no action was taken, the State Government passed a resolution for the name change in December 2011.[45] The Union Government accepted the proposal in 2012[46] and formally approved it in July 2013.[45] The airport was officially renamed Kempegowda International Airport on 14 December 2013 amid the inauguration of the expanded terminal building.[47]
Kingfisher Airlines once operated a hub and was one of the largest airlines at the airport. Following its collapse in October 2012, other airlines stepped in to fill the gap in domestic connectivity by adding more flights.[48] In addition, Air Pegasus and AirAsia India launched hub operations at the airport in 2014.[49][50]
The first phase of expansion was launched in June 2011 and finished in December 2013.[51][52] The ₹15 billion (US$200 million) project doubled the size of the passenger terminal to 150,556 square metres (1,620,570 sq ft), involving the construction of additional facilities for check-in, immigration, security and baggage reclaim.[52][53] One domestic gate and three international gates were added as well. A large, sweeping roof connects the original building with the expanded areas.[54] The expanded terminal, dubbed "Terminal 1A", has raised the annual passenger capacity of the airport to 25 million.[55]
Ethiopian Airlines began the first and only flights between Bangalore and Africa in 2019, linking the city to its hub in Addis Ababa.[56] Two years later, an Air India Boeing 777-200LR arrived from San Francisco, marking the first direct service between the United States and Bangalore, as well as South India as a whole.[57][58] The flights operate under a temporary arrangement between the Indian and American governments that facilitates non-stop air travel between the two countries during the COVID-19 pandemic. Air India has not indicated whether it will continue to fly this route after the agreement ends. Air India has withdrawn BLR-SFO in the Summer Schedule of 2022 and hopes to reintroduce this route from Winter Schedule 2022.[59] United Airlines and American Airlines are scheduled to initiate non-stop flights from San Francisco and Seattle/Tacoma from 30 and 31 October 2022 respectively.
Qantas, in April 2022, announced a first ever direct flight between Bangalore and Sydney, Australia. This is also a first ever direct flight between Australia and South India. Qantas expects to begin flying to Bangalore from 14 September 2022. From then, Bangalore international airport will have non-stop flights to 5 continents around the world.
Ownership
The airport is owned and operated by Bengaluru International Airport Limited (BIAL), a public limited company. The Government of India has granted BIAL the right to operate the airport for 30 years, with the option to continue for another 30 years. The company is a public–private consortium venture. GVK initially owned 43% of the shares in Bangalore Airport. In 2016, GVK decided to divest its 33% share of in BIAL to Fairfax Financial for ₹2149 cr. In March 2017, GVK confirmed having done so.
Finally, in January 2018, GVK decided to sell the remaining 10% shares to Fairfax Financial for ₹1,290 crore and exit Bangalore Airport completely.[60]
26% is held by government entities Karnataka State Industrial Investment and Development Corporation (13%) and Airports Authority of India (13%), and 74% is held by private companies Fairfax Financial (54%) and Siemens Project Ventures (20%).[61][62][63]
In March 2021 the Airports Authority of India announced their plans to sell their 13% stake in order to raise funds. Between FY 2022–2025, the Government aims to raise as much as ₹20,782 crore through aviation. The process will start with the selling of stakes of Bangalore Airport followed by Hyderabad, Mumbai and Delhi.[64]
Facilities

Runways
Kempegowda International Airport has two runways in use.
- Runway 09L/27R: 4,000 by 45 metres (13,123 ft × 148 ft), CAT I, ILS equipped.[65][66]
- Runway 09R/27L: 4,000 by 60 metres (13,120 ft × 200 ft), CAT III, ILS equipped.[65][66]
Four years after it was laid, the runway was entirely resurfaced because of a serious decline in quality.[67] From 11 March to 3 April 2012, it was closed daily between 10:30 am and 5:30 pm.[68] As a result, BIAL accused construction company Larsen & Toubro of building the runway poorly.[69] South of runway 09/27 are a full-length parallel taxiway and the apron, which extends from the Blue Dart/DHL terminal to the passenger terminal.
The construction of the second runway at the airport is now complete, and was officially in use from 6 December 2019, when an Indigo airlines flight (6E 466) to Hyderabad took off from runway 09R.[70] The runway will cater to all types of aircraft including Code-F aircraft like Airbus A380 and Boeing 747-8 and will be equipped with CAT IIIB ILS. The runway will also feature an associated parallel taxiway and two cross-field taxiways on the east linking the new runway to the existing north runway and the aprons at Terminal 1 and the upcoming Terminal 2. The existing runway will also be upgraded as part of the expansion work.[71]
The old runway (Runway 09L/27R) was closed from 22 June 2020 for nine months for rehabilitation and strengthening.[72] The runway was opened for service again on 31 March 2021 and now put into service with the south runway making KIA the first airport in South India to have parallel runway operations.[73]
Terminals

A single integrated passenger terminal accommodates both domestic and international operations. It covers 150,556 m2 (1,620,570 sq ft) and can handle 20 million passengers annually.[53][55] Check-in and baggage reclaim are situated on the lower floor, while departure gates are located on the first floor. Gates 1, 2, 12–18, 28–30 on the first floor are used for domestic departures, gates 31–42 on the first floor are used for international departures, gates 3–9 and gates 19–25 form the Western and Eastern bus gates respectively.[74] Gate 41–42 is equipped to serve the world's largest passenger aircraft, the Airbus A380.[75] Lounges are provided by Above Ground Level and Plaza Premium Lounge, which also operates a day hotel in the terminal.[76] For VIPs there is a separate 930-square-metre (10,000 sq ft) lounge.[54][77][78]
Expansion

Under the second phase of the airport's expansion, a new terminal called Terminal 2 is being built.[79] The new terminal has been designed by architectural firm Skidmore, Owings & Merrill and is being built by Larsen & Toubro.[79]
Aviation fuel services
The airport has a fuel farm, spread over 11 acres (4.5 ha) west of the cargo village and passenger terminal. It was built by IndianOil SkyTanking Ltd (IOSL) but is shared by multiple oil companies.[80] In October 2008, Indian Oil commissioned a 36-kilometre (22 mi) fuel pipeline between its storage terminal in Devanagonthi and Kempegowda Airport. Previously, jet fuel had to be transported to the airport by tank trucks, which created traffic and pollution problems.[81]
Cargo facilities
Kempegowda Airport has three cargo terminals. One is operated by AISATS Ltd and has a capacity for 150,000 tonnes (170,000 short tons) of cargo;[82] it includes a facility for storing pharmaceuticals.[83]
DHL and Blue Dart Aviation jointly operate a 20,500-square-metre (221,000 sq ft) terminal.[84]
BIAL inaugurated a separate cargo village in December 2008. The village is spread over 11 acres (4.5 ha) and includes office space, conference rooms, a cafeteria for staff and parking space for nearly 80 trucks.[82] It did not open for occupation until 2010 and initially suffered low occupancy, which some cargo agents attributed to the opening delay, high rent and limited infrastructure.[85]
Day Hotel
The Day Hotel is located on the second level (Domestic Departures) and open 24 hour for passengers with boarding passes or flight tickets.[86] It consists of 20 rooms of different categories.
Lounges
There are two lounges in the Airport, namely BLR Domestic Lounge and BLR International Lounge.
Other Facilities
IndiGo MRO

In January 2019, InterGlobe Aviation Ltd, which operates India’s largest domestic airline IndiGo, announced the plans to construct an aircraft maintenance , repair and overhaul (MRO) facility at Bangalore Airport, its second MRO facility in India, to cater to the growing of mostly Airbus fleet. Currently, IndiGo operates its 2nd largest base at Bangalore Airport.
The Facility will be built in the Bangalore Airport premises, near the fuel farm.
IndiGo signed a 20 Years pact with Bangalore International Airport Limited (BIAL), for sub-leasing five acres of land to build a 13,000 sq.mt facility. Once opened; The facility will be able to service two narrow body planes at a time. By building the second MRO at Bangalore airport, IndiGo will be able to save on the high costs incurred by servicing planes over seas.
The MRO facility is expected to have support infrastructure, including a Quick Engine Change (QEC) to change an aircraft engine in minimal time. It is also said to have warehouses and engineering offices for maintenance and repair of an aircraft.
The facility was expected to be opened by March 2022. However; Pandemic has delayed the project. Currently, the facility is under construction.[87]
IndiGo Ifly Training Academy
On 4 September 2019, India's leading airline, IndiGo announced that it will extend its learning academy, ifly to Bangalore, its 2nd such facility in India. The facility will be built in the Airport campus. The training is said to be instrumental in extending training to IndiGo employees.
Starting 6 September 2019, ifly facilitated training to the airline employees. With over 27,000 employees, there are over 100 instructors in the academy, who conducts workshops on regular basis.
The Ifly learning academy of IndiGo Airlines facilitates special trainings throughout the year to its employees including required skills for job performance, customer services, ramp and marshalling training, safety and emergency procedures, departure control system, communication and leadership training and e-learning to name the few.[88]
Future plans
The second phase of expansion is underway, which encompasses the construction of a second runway and passenger terminal. When complete, Kempegowda Airport will be able to handle 55 million passengers per year.[89][90] The estimated ₹40 billion (US$520 million) project received clearance from the Ministry of Environment and Forests in September 2014.[91][92]
Ground work on the second runway began in February 2016 and the runway opened in December 2019.[91][93] Located south of the original terminal, it is parallel to runway 09/27 and measures 4,000 by 60 metres (13,120 ft × 200 ft), wider than the original runway so it can accommodate larger aircraft. The new runway is also CAT III certified, allowing for landings in fog and other low visibility conditions.[94]
A second terminal is being constructed to meet the airport's expected growth, and it will be constructed in two phases. This terminal has been designed by Skidmore, Owings & Merrill, and the construction contract has been awarded to Larsen & Toubro. In the first phase, the terminal will cater to 25 million passengers annually. Terminal 2 is estimated to cost ₹30.37 billion (US$400 million).[95][96] Due to the COVID-19 pandemic, which caused a shortage of manpower and resulted in delays of work, Terminal 2 is now expected to be completed by mid-2022. All International flights will be operated from T2[97]
A third runway, north of the current runway is being planned to cater to the growth of air traffic in the airport which will be situated 1500 meters north of the current runway. Dubbed as the "New North Parallel Runway,", the officials hope to ease air traffic congestion with the third runway.[98]
IndiGo announced in January 2019, its plan to build a second maintenance repair and overhaul facility at the airport, which was expected to be operational by March 2020.[99]
Airlines and destinations
Passenger
Cargo
Connectivity


Road
Kempegowda Airport is connected to the city of Bangalore by National Highway 44 (NH 44). In January 2014, a six-lane flyover was completed over NH 44 between Hebbal and the airport, helping to reduce travel time to and from the city.[186][187] Two alternative routes are under construction and will be completed by March 2017, one through Thanisandra and the other through Hennur.[188] The airport car park is located at ground level and can hold 2,000 vehicles.[17] The airport is served by several taxi and rental car companies.[189] In addition, ride-sharing companies Ola Cabs and Uber have their own pick-up zones outside the terminal.[190][191]
The Bangalore Metropolitan Transport Corporation (BMTC) provides bus transportation to major parts of the city through the Vayu Vajra (Kannada for "Diamond in the Air") service.[192] It is operated using a fleet of Volvo B7RLE buses. In addition, the Karnataka State Road Transport Corporation (KSRTC) operates a nonstop bus service called "Flybus" between Kempegowda Airport and Mysore, as well as a route to Manipal via Mangalore.[193]
Rail
A halt at the KIA boundary commenced operations in January 2021.[194] The train halt is connected to the airport terminal via short five-minute shuttle busses. Every day five trains from the city towards Devanahalli stop at the KIA halt and five trains head back.[195] Future plans include electrification of the route to introduce comfortable MEMU trains to the airport. MEMU trains from Mysore that terminate at Yelahanka could be extended up to Devanahalli via the KIA halt station, benefitting airport-bound passengers from Mysore, Channapatna, Ramanagaram and Bidadi.[196]
Metro
The plan to build a metro link between Bangalore and the airport with two stations at the airport was revived in 2020 and is now under construction.[197] In January 2019, Karnataka Government approved the Bangalore Airport Metro line. The project which is envisioned to link Bangalore City with the airport is under Phase 2B of Namma Metro, and is 37 km long. The blue line also known as Line-5 (KR Puram-Hebbal-Kempegowda International Airport) will have 17 stations as an extension of Line-5 (ORR Line) via KR Puram, Nagawara, Hebbal And Yelahanka. The project is estimated to be completed by December 2024.[198]
There are two metro stops being built in the airport campus, one near the upcoming Airport City, which will be partly elevated and the other one in the Multi Modal Transport Hub opposite the upcoming Terminal 2, which will be a level below the ground, for which BMRCL plans to dig 4 to 5 metres below the ground. The cost of building these two stations is estimated to be Rs 800 crore. The total cost of the project is expected to be Rs14,788 Crores.[199]
To ensure last-mile connectivity for passengers, a service road will be provided around the Metro Stations in the Airport premises, for integration with BMTC buses. Plans are to build a 6m wide road.[200]
High Speed Rail Link (HSRL)
In August 2021, Karnataka Chief Minister Basavaraj Bommai declared plans of building a High Speed Rail Link (HSRL) connecting the airport and the city. If constructed, the airport will be connected by three different railway lines: the Metro, Suburban rail and High-speed rail, making it a distinctive airport connected with all three (modes of transportation).
This is not the first time this is planned. Plans to build an HSRL was earlier planned in 2001 and was revived again in 2013, but was shelved both times due to issues in land acquisition and high costs involved.[201] More recently, the plan has been revived, as the Chief Minister believes that this has been their dream and they are going to get it done as no international airport in the world has got all three (modes of transportation).[201]
Virgin Hyperloop
In September 2019 Virgin Hyperloop proposed to undertake a first-of-its-kind project of a hyperloop corridor connecting the Airport and the city, for which the two parties have signed an MoU to look into its feasibility.
It was expected that a pre-feasibility study will be undertaken in two different phases lasting six months each. This study intends to focus on economic, technical and route feasibility. The hyperloop, with top speed of 1080 kmph, could transport thousands of passengers per hour between the city and the airport in under 10 minutes.[202]
References
- "Prem Watsa's Fairfax now owns Bengaluru Airport – Times of India". The Times of India. Archived from the original on 8 May 2019. Retrieved 20 February 2019.
- "DHL Express opens its EUR22 million expanded Bengaluru Gateway to support e-commerce growth". enmobile.prnasia.com. Retrieved 1 February 2022.
- "Annexure III - Passenger Data" (PDF). www.aai.aero (PDF). Retrieved 22 April 2022.
{{cite web}}
: Check|archive-url=
value (help)CS1 maint: url-status (link) - "Annexure II - Aircraft Movement Data" (PDF). www.aai.aero. Archived (PDF) from the original on 1 May 2018. Retrieved 19 May 2021.
- "Annexure IV - Freight Movement Data" (PDF). www.aai.aero. Archived (PDF) from the original on 22 April 2022. Retrieved 22 April 2022.
- "About Kempegowda International Airport Code". Retrieved 31 January 2022.
- "CleanMax Solar to power Chennai Metro – Times of India". The Times of India. Archived from the original on 27 September 2017.
- "Kempegowda International Airport" (PDF). Archived from the original (PDF) on 22 September 2017. Retrieved 19 September 2017.
- "KIA". Retrieved 5 January 2022.
- "Top 5 Airports of India by cargo traffic in 2020". 7 September 2020. Archived from the original on 14 June 2021. Retrieved 14 June 2021.
- "L&T bags Bengaluru airport contract to build terminal two". Economic Times. 3 October 2018. Retrieved 7 August 2019.
- "First flight takes off from second runway at Bengaluru airport". The Hindu. 6 December 2019. Archived from the original on 9 December 2019. Retrieved 9 December 2019.
- "2020 - Best Airport by Size and Region". ACI World. Archived from the original on 1 March 2021. Retrieved 3 March 2021.
- "Bangalore Airport History". Retrieved 5 January 2022.
- "Royal Nepal Airlines to Bangalore". Archived from the original on 13 July 2021. Retrieved 5 January 2022.
- "The History And rise of Bangalore Airport". 19 July 2020. Retrieved 5 January 2022.
- "Bangalore International Airport, India". Airport Technology. Archived from the original on 15 March 2016. Retrieved 9 March 2016.
- "Hard times ahead for city airport authorities". The Hindu. 31 October 2005. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
- David, Stephen (31 January 1997). "Grounded by politics". India Today. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
- "Cover Story: Bangalore". India Today. 7 November 2005. Archived from the original on 1 October 2009. Retrieved 30 March 2016.
- "Airport Projects: Bangalore International Airport". Infrastructure Development Department, Government of Karnataka. Archived from the original on 10 March 2016. Retrieved 9 March 2016.
- "Bangalore Airport History". Retrieved 6 January 2022.
- Chakravarti, Sudeep (20 July 1998). "This flight is delayed". India Today. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
- D. S., Madhumathi (9 January 2001). "Hunt for Devanahalli airport partners begins". The Hindu Business Line. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
- "Siemens team wins bid to build international airport in Bangalore: Reuters". Rediff. 1 November 2001. Archived from the original on 24 October 2012. Retrieved 22 July 2015.
- "Devanahalli airport work has begun". The Hindu. 7 May 2005. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
- Ramanathan, Ramesh (11 February 2008). "Grounded at the word go". Live Mint. Archived from the original on 10 March 2016. Retrieved 9 March 2016.
- D. S., Madhumathi (18 March 2004). "Ministry clears Bangalore airport project – BIAL seeks review of draft version of concession pact". The Hindu Business Line. Archived from the original on 13 September 2005. Retrieved 9 March 2016.
- "Concession agreement for airport signed". The Hindu. 5 July 2004. Archived from the original on 16 February 2005. Retrieved 9 March 2016.
- "All clear now for new Bangalore airport". The Hindu. 15 June 2004. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
- "Bangalore airport work to begin on July 2". The Hindu Business Line. 27 June 2005. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
- "Siemens bags another order for Bangalore airport". Oneindia. 27 July 2006. Archived from the original on 10 April 2016. Retrieved 10 April 2016.
- "BIAL plans rail link between Devanahalli airport and city". The Hindu. 21 May 2006. Archived from the original on 10 April 2016. Retrieved 10 April 2016.
- D. S., Madhumathi (23 October 2007). "Bangalore international airport launch set for March 30". The Hindu Business Line. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
- "BIAL relents, sets May 11 as new date for airport opening". Oneindia. 13 March 2008. Archived from the original on 10 March 2016. Retrieved 9 March 2016.
- Urvashi, Jha (2008). "Bengaluru airport wait gets longer". mydigitalfc.com. Archived from the original on 3 April 2016. Retrieved 9 March 2016.
- "Slow take-off for airport stir". Gulf News. 13 March 2008. Archived from the original on 4 March 2016. Retrieved 30 March 2016.
- Raghu, K. (17 May 2008). "Citizen's body protests closure of old Bangalore airport". Live Mint. Archived from the original on 3 April 2016. Retrieved 30 March 2016.
- Vaswani, Karishma (16 May 2008). "Battle over new Bangalore airport". BBC News. Archived from the original on 21 May 2008. Retrieved 30 March 2016.
- Nanjappa, Vicky (23 May 2008). "Decks cleared for new Bangalore airport". Rediff. Archived from the original on 24 September 2008. Retrieved 30 March 2016.
- Nanjappa, Vicky (24 May 2008). "Bangalore airport takes wings". Rediff. Archived from the original on 20 September 2008. Retrieved 9 March 2016.
- "India's airport sector vibrant, with tenders for six PPP concessions: CAPA Mumbai Summit, 3/4 Feb". CAPA – Centre for Aviation. 20 January 2015. Archived from the original on 15 April 2015. Retrieved 9 April 2016.
- "Bangalore's new airport almost ready for use". anna.aero. 16 May 2008. Archived from the original on 30 July 2010. Retrieved 30 March 2016.
- "Karnataka govt proposes renaming Bengaluru International Airport". Times of India. 27 February 2009. Archived from the original on 3 April 2016. Retrieved 14 March 2016.
- "Bangalore airport named after city founder Kempe Gowda". Business Standard. 17 July 2013. Archived from the original on 5 March 2016. Retrieved 14 March 2016.
- "Centre accepts proposal to name Bengaluru International Airport after Kempegowda". The Economic Times. 6 April 2012. Archived from the original on 26 January 2013. Retrieved 14 March 2016.
- "Bangalore International Airport Ltd will be Kempegowda International Airport from December 14". The Economic Times. 24 November 2013. Archived from the original on 15 March 2016. Retrieved 14 March 2016.
- Sukumaran, Ajay (12 July 2013). "Bangalore Airport looks to woo domestic airlines to set up hub". Indian Express. Archived from the original on 3 April 2016. Retrieved 31 March 2016.
- Dhamija, Anshul; Kurian, Boby (21 January 2014). "Air Pegasus 3rd airline to take off from Bangalore". Times of India. Archived from the original on 21 January 2016. Retrieved 31 March 2016.
- "AirAsia launches India ops from Bangalore". The Hindu. 12 June 2014. Archived from the original on 5 January 2016. Retrieved 31 March 2016.
- "Work on Bangalore International Airport expansion set to begin in June". Daily News and Analysis. 24 May 2011. Archived from the original on 3 April 2016. Retrieved 12 March 2016.
- G., Chandrashekar (15 December 2013). "New terminal inaugurated at airport". Deccan Chronicle. Archived from the original on 8 March 2016. Retrieved 11 October 2015.
- "BIA Terminal 1 Expansion Capacity, Design And Construction Update 2012-05-07". Kempegowda International Airport Bengaluru. 7 May 2012. Archived from the original on 30 June 2015. Retrieved 11 October 2015.
- "Master plan to develop airport real estate". The Hindu. 14 December 2013. Archived from the original on 19 December 2013. Retrieved 13 March 2016.
- Acharjee, Sonali (16 December 2013). "Bangalore unveils its new international airport terminal". India Today. Archived from the original on 22 December 2015. Retrieved 11 October 2015.
- "Bengaluru gets 1st direct flight to Africa". Times of India. 29 October 2019. Archived from the original on 23 April 2021. Retrieved 23 April 2021.
- "SFO Welcomes Air India Flights to Bangalore (Bengaluru): The Only Nonstop Service from the United States to Bengaluru". San Francisco International Airport. January 2021. Archived from the original on 29 April 2021. Retrieved 28 April 2021.
- Sinha, Saurabh (26 November 2020). "AI's Bengaluru-San Francisco to be first scheduled direct between south India & US". Times of India. Archived from the original on 29 April 2021. Retrieved 28 April 2021.
- Dhamija, Anshul (12 January 2021). "India to the U.S.: The ultra-long haul travel". Fortune India. Archived from the original on 28 January 2021. Retrieved 28 April 2021.
- Sundarajan, Priya (11 January 2018). "GVK to sell 10% stake in Bengaluru airport to Fairfax for ₹1,290". Business Line. Retrieved 21 April 2022.
- "Zurich Airport sells 5% stake in Bangalore airport to Fairfax for $48.9 mn". The Hindu Business Line. 18 April 2016. Archived from the original on 19 April 2016. Retrieved 3 June 2016.
- "GVK exits B'luru airport, sells residual 10% stake to Fairfax". www.freepressjournal.in. Retrieved 5 January 2022.
{{cite web}}
: CS1 maint: url-status (link) - "FAIRFAX INDIA HOLDINGS CORPORATION" (PDF). Archived (PDF) from the original on 26 December 2019. Retrieved 21 November 2019.
- "Government to exit Hyderabad & Bengaluru JV airports". The Times of India. Retrieved 27 November 2021.
- "VOBL – Kempegowda Int/ Bengaluru Airport". SkyVector. 26 May 2016. Archived from the original on 25 June 2016. Retrieved 3 June 2016.
- "Technical Information". Airports Authority of India. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
- Taneja, Kabir (4 March 2012). "Bangalore airport to close down for repairs". Sunday Guardian. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
- "No flights at BIA for 7 hrs from today". Times of India. 11 March 2012. Archived from the original on 31 March 2015. Retrieved 12 March 2016.
- Badrinath, Raghuvir (6 March 2012). "Bangalore airport turns the heat on L&T over runway". Business Standard. Archived from the original on 13 March 2016. Retrieved 12 March 2016.
- "First flight takes off from second runway of KIA". Deccan Herald. 6 December 2019. Archived from the original on 7 December 2019. Retrieved 14 December 2019.
- "KIA begins work on 2nd runway; to be linked to Terminal 2 apron". Deccan Herald. November 2016. Archived from the original on 18 January 2017. Retrieved 17 March 2017.
- "Closed Kempegowda International Airport runway to begin operations by March-end". The New Indian Express. 8 February 2021. Archived from the original on 25 February 2021. Retrieved 6 April 2021.
- "Bengaluru: Kempegowda International Airport gets parallel runways, first in south India". The Times of India. 26 March 2021. Archived from the original on 27 March 2021. Retrieved 6 April 2021.
- "Information on New Boarding Gates Numbering". Kempegowda International Airport Bengaluru.
- "Bangalore airport named after city founder Kempegowda". NDTV. 15 December 2013. Archived from the original on 19 March 2016. Retrieved 15 March 2016.
- Nair, Athira (25 June 2015). "Kempegowda International Airport set to sport a trendy look by October". The Economic Times. Archived from the original on 4 October 2015. Retrieved 31 March 2016.
- Prakash, Rakesh (10 November 2014). "Sri Lankan PM traveled like any ordinary flier, in all humility". Bangalore Mirror. Archived from the original on 28 January 2016. Retrieved 31 March 2016.
- Arora, Vijay (19 February 2021). "Bengaluru Airport: Both Runways To Become Operational From March 25". Z Travel News Worldwide. Retrieved 10 March 2021.
- Urs, Anil (11 February 2017). "BIAL ropes in US firm to design KIA Terminal 2". The Hindu Business Line. Archived from the original on 20 March 2018. Retrieved 17 March 2017.
- Kulkarni, Mahesh (19 August 2008). "Fuel deals: Indian Oil JV eyes Mumbai, Delhi airports". Rediff. Archived from the original on 15 April 2011. Retrieved 12 March 2016.
- "IOC does its groundwork for Devanahalli airport". The Hindu. 15 October 2008. Archived from the original on 3 April 2016. Retrieved 12 March 2016.
- "Cargo village takes off at B'lore airport". Business Standard. 10 December 2008. Archived from the original on 3 April 2016. Retrieved 31 March 2016.
- "Menzies opens pharma cold zone in Bangalore". Air Cargo World. 25 August 2014. Archived from the original on 26 March 2015. Retrieved 12 March 2016.
- Agarwal, Devesh (21 November 2008). "DHL and Blue Dart open integrated terminal at Bangalore airport". Bangalore Aviation. Archived from the original on 12 April 2016. Retrieved 31 March 2016.
- "Cargo Village at BIA is still half full". Deccan Herald. 28 November 2010. Archived from the original on 19 February 2011. Retrieved 31 March 2016.
- "Plaza Premium Lounge opens Day Hotel at Kempegowda airport". The Hindu Businessline. 25 November 2017.
- Kundu, Rhik (31 January 2019). "IndiGo ties up with BIAL to build its second MRO facility in Bangalore". Mint. Retrieved 25 February 2022.
- "IndiGo launches second iFLY facility in Bengaluru". 4 September 2019. Retrieved 26 February 2022.
- "India's Bengaluru airport to construct second terminal and runway in 2016". Airport Technology. Archived from the original on 22 January 2016. Retrieved 22 January 2016.
- "Bengaluru airport T2 phase-1 by 2021, will handle 20 mn more flyers". Business Standard. 19 January 2016. Archived from the original on 26 January 2016. Retrieved 21 January 2016.
- Peter, Petlee (5 April 2016). "Work on Terminal 2 at KIA begins". The Hindu. Archived from the original on 21 December 2016. Retrieved 8 April 2016.
- "Clearance for Airport Expansion". New Indian Express. 5 September 2014. Archived from the original on 20 March 2016. Retrieved 15 March 2016.
- CS, Hemant (28 October 2017). "Larsen and Tubro to fast-track runway work at the Kempegowda International Airport". Bangalore Mirror. Archived from the original on 2 January 2018.
- "BIAL moves forward on second runway. Target completion in two years". Bangalore Aviation. 21 January 2016. Archived from the original on 29 January 2016. Retrieved 24 January 2016.
- "L&T to construct Terminal 2 of Kempegowda Int'l Airport". deccanherald.com. 3 October 2018. Archived from the original on 15 October 2018. Retrieved 15 October 2018.
- "L&T bags Rs 3,036-cr order to build terminal-2 of Bengaluru international airport – The Economic Times". The Economic Times. Economictimes.indiatimes.com. 3 October 2018. Archived from the original on 15 October 2018. Retrieved 15 October 2018.
- "T2 expansion work to be done by mid-2022 - Bangalore Mirror". bangaloremirror.indiatimes.com. Retrieved 5 December 2021.
- Kappan, Rasheed (2 November 2017). "With eye on future growth, KIA plans third runway". deccanherald.com. Archived from the original on 23 October 2018. Retrieved 23 October 2018.
- Sinha, Saurabh (31 January 2019). "IndiGo to build MRO at Bengaluru airport, its second in India". The Times of India. ennett, Coleman & Co. The Times Group. Archived from the original on 31 January 2019. Retrieved 31 January 2019.
- "Flights from Bangalore". Air Arabia. Retrieved 6 December 2021.
- December 2021 https://www.airasia.com/flights/kuala-lumpur-selangor/access-date=6 December 2021.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - "Air France schedule". Retrieved 6 December 2021.
- "Air India Schedule". Retrieved 28 March 2022.
- "Air India International Schedule". Retrieved 18 April 2022.
- "Air India Express Schedule". Retrieved 28 March 2022.
- Deboo, Jazreen (1 March 2018). "AirAsia India commences operations from Nagpur and Indore". Business Traveller India. Mumbai: Panacea Publishing Pvt Ltd. Archived from the original on 26 January 2021. Retrieved 18 March 2021.
- Alliance Air (U/O) [@AllianceAir] (17 November 2021). "Alliance Air starting daily direct flights from Bengaluru to Goa effective 26th November 2021" (Tweet). Retrieved 8 December 2021 – via Twitter.
- "Alliance Air to Commence Daily Flights Between Bengaluru and Hyderabad". Archived from the original on 9 July 2021. Retrieved 5 July 2021.
- "Alliance Air daily flights from Dec.1". The Hindu. 12 November 2021. Retrieved 8 December 2021.
- "Alliance Air". www.allianceair.com. Archived from the original on 21 October 2019. Retrieved 21 April 2021.
- "Airlines are expanding their international networks as the world's borders slowly open after nearly 2 years of uncertainty — here are 13 high-profile long-haul routes coming in 2022". Business Insider. 1 January 2022.
- "Flights to Bangalore (BLR) | Book now with British Airways". Archived from the original on 27 September 2016.
- "Flights to Bengaluru (BLR)". Emirates United Arab Emirates.
- "Ethiopian Airlines Schedule to BLR". Ethiopian Airlines. Retrieved 11 March 2022.
- "Etihad Destinations". Retrieved 6 December 2021.
- "Go First Schedule Dec 2021". Go First. Retrieved 1 December 2021.
{{cite web}}
: CS1 maint: url-status (link) - "Gulf Air schedule". Retrieved 18 March 2022.
- "Direct Flights Information, Status & Schedule | IndiGo". www.goindigo.in. Archived from the original on 14 January 2021. Retrieved 12 January 2021.
- "New Flight Status And Schedule-Indigo". Archived from the original on 31 March 2019. Retrieved 25 March 2021.
- "IndiGo to resume Bangalore-Bangkok service from Mar-2022". Retrieved 13 February 2022.
- "IndiGo to begin Bareilly to Mumbai, Bengaluru flights from April 29". Business Today. Archived from the original on 4 March 2021. Retrieved 4 March 2021.
- "Bengaluru airport now connects 61 domestic destinations, mostly non-metro cities". www.indianexpress.com. Archived from the original on 12 April 2021. Retrieved 11 February 2021.
- "New Flights". Indigo. Retrieved 20 February 2022.
- "Qatar Airways and IndiGo reactivate strategic cooperation". Retrieved 21 April 2022.
- "Indigo to operate 22 new domestic flights from 28 March". www.livemint.com. Archived from the original on 12 April 2021. Retrieved 11 February 2021.
- "Gaya airport to operate flights to Delhi, Kolkata, Mumbai from March 28". Times of India. Archived from the original on 3 March 2021. Retrieved 3 March 2021.
- "direct flight to Bangalore will start again from today". Hindustan. Retrieved 18 March 2021.
- "New Flights Information, Status & Schedule | IndiGo". www.goindigo.in. Retrieved 8 March 2022.
- "Bangalore-Jorhat direct flights". www.thehindubusinessline.com.
- "IndiGo to start flights between Kadapa & five cities from March 27 onwards". The Economic Times. Retrieved 24 February 2022.
- "IndiGo to start flights connecting Kanpur from October 31". Business Standard India. Press Trust of India. 29 September 2021. Archived from the original on 29 September 2021. Retrieved 29 September 2021.
- Susarla, Ramesh (30 January 2021). "IndiGo flights from Kurnool to begin on March 28". The Hindu. Archived from the original on 30 January 2021. Retrieved 30 January 2021.
- "India-Maldives flights to resume from July 15". The Times of India. Retrieved 8 November 2021.
- "Indigo to operate 22 new domestic flights from 28 March". www.livemint.com. 11 February 2021. Archived from the original on 11 February 2021. Retrieved 11 February 2021.
- "Indigo begins Bangalore-Silchar Direct flights". 15 February 2021. Archived from the original on 7 November 2021. Retrieved 6 April 2021.
- "IndiGo to resume Bangalore-Singapore service from Mar-2022". Retrieved 13 February 2022.
- "Indigo resumes flights to Singapore". Retrieved 6 December 2021.
- "JAL schedule". Retrieved 27 January 2022.
- "KLM to resume flight services on Bengaluru-Amsterdam route from May 25". Retrieved 14 April 2022.
- "Kuwait Airways Destinations in Indian sub-continent". Kuwait Airways. Retrieved 21 December 2021.
- "Lufthansa Schedule and Flight Status". Retrieved 25 December 2021.
- "Malaysia Airlines Announced Resumption of Schedule Operations Between India And Malaysia Effective March 27". Retrieved 20 April 2022.
- Nepal Airlines [@NepalAirlinesRA] (10 March 2022). "Resumption of KTM-BLR-KTM" (Tweet). Retrieved 10 March 2022 – via Twitter.
- "Flight Resumption from Muscat". Oman Air. Retrieved 6 December 2021.
- "Qantas and jetstar expand Sydney gateway with new direct flights to India and Korea". 8 April 2022. Retrieved 8 April 2022.
- "Qatar Airways Schedule". Retrieved 31 March 2022.
- "Saudia Network". Retrieved 2 May 2022.
- "Singapore Airlines to resume services across India". www.thehindubusinessline.com.
- "Guwahati airport adds more connectivity to Bengaluru". Retrieved 20 April 2022.
- "SpiceJet to resume services from Puducherry airport on March 27". The Hindu. 9 March 2022. Retrieved 10 March 2022.
- "SpiceJet schedule Dec 2021". SpiceJet. Retrieved 1 December 2021.
{{cite web}}
: CS1 maint: url-status (link) - "SriLankan Airlines resumes regular flights to and from India". Retrieved 8 November 2021.
- "Flight Schedule". Star Air. Retrieved 1 December 2021.
{{cite web}}
: CS1 maint: url-status (link) - "AirAsia Resumes Flights to Seven Countries on 18 Routes this April! Fly Easy with No Quarantine". Retrieved 26 March 2022.
- "Thai Airways International Routes Start To Return". Retrieved 21 January 2022.
- "TIMETABLE". Thai Airways International. Retrieved 24 February 2022.
- "United delays San Francisco to Bangalore". Retrieved 16 January 2022.
- "Vistara Flight Schedules". Vistara. Retrieved 1 April 2022.
- "Route map Dec 2021". vistara. Retrieved 1 December 2021.
{{cite web}}
: CS1 maint: url-status (link) - "Vistara Flight Schedules". Vistara. Retrieved 30 December 2021.
- "Vistara Domestic Flight Schedule". Retrieved 27 March 2022.
- "DHL Express adds Boeing 777 link from India to Germany". Post & Parcel. 13 October 2011. Archived from the original on 27 March 2016. Retrieved 17 March 2016.
- "Blue Dart Aviation (BZ) flights from Bengaluru (BLR)". FlightMapper. Retrieved 17 March 2016.
- Chandramouly, Anjana (4 August 2011). "Cathay Pacific Cargo to add more ports in India". The Hindu Business Line. Archived from the original on 3 April 2016. Retrieved 17 March 2016.
- "D0690 Flight History". Retrieved 2 February 2022.
- "ROUTE NETWORK 9 June 2020 Management Summary" (PDF). Emirates SkyCargo. Archived (PDF) from the original on 6 September 2021. Retrieved 21 March 2021.
- "Ethiopian Airlines starts cargo operation to Bengaluru". Business Standard. 14 December 2015. Archived from the original on 24 March 2016. Retrieved 17 March 2016.
- "Starting this month, Etihad Cargo is offering new weekly freighter services from Abu Dhabi (AUH) to Johannesburg (JNB) and Bangalore (BLR)". 6 March 2018. Retrieved 1 February 2022.
- "Bangalore is FedEx's global hub for South". The Hindu Business Line. 12 August 2010. Archived from the original on 3 April 2016. Retrieved 17 March 2016.
- "FedEx launches direct cargo flight from Bangalore to Europe, US". Archived from the original on 4 November 2021. Retrieved 7 November 2021.
- "LH 8472". Retrieved 18 January 2022.
- "LH Cargo Flights from BLR". Retrieved 1 February 2022.
- "MASkargo adds Bangalore to its cargo network". The Star Online. 22 May 2015. Archived from the original on 13 May 2016. Retrieved 17 March 2016.
- "Connecting BLR with EU, US". Retrieved 6 January 2022.
- "Qatar Airways Cargo Schedule". Retrieved 1 February 2022.
- "QuikJet Cargo's inaugural flight touches down at KIAB, Bengaluru". The Stat Trade Times. 17 February 2016. Archived from the original on 20 December 2016. Retrieved 17 March 2016.
- "Sauda Cargo network". Retrieved 1 February 2022.
- "Sichuan Airlines Begin Cargo Service To Bangalore". 29 March 2021. Archived from the original on 1 April 2021. Retrieved 7 April 2021.
- "Singapore Airlines Cargo Flight Schedules". Singapore Airlines Cargo.
- Shri Guru Ram Das Ji International Airport (U/O) [@amritsarairport] (26 June 2020). "Amritsar Airport welcomes beginning of Cargo Operations of 'SpiceXpress' by @flyspicejet through flight SG7496 which will fly from Amritsar to Moscow, New Delhi and Bengaluru" (Tweet). Retrieved 9 January 2021 – via Twitter.
- Prince Mathews Thomas (17 October 2018). "SpiceJet's air cargo unit SpiceXpress looks to increase capacity, reach". moneycontrol.com. Archived from the original on 18 October 2018. Retrieved 18 October 2018.
- "SpiceJet launches air cargo services on domestic and international routes". Archived from the original on 28 October 2021. Retrieved 28 October 2021.
- "Kempegowda International Airport will link to seven more cities". The New Indian Express. 29 October 1947. Archived from the original on 30 October 2018. Retrieved 29 October 2018.
- "All-cargo direct flight opens, linking Kunming - Bangalore- Wuhan". Archived from the original on 11 August 2020. Retrieved 26 March 2021.
- "Flight history for YTO Cargo Airlines flight YG9161". Retrieved 1 February 2022.
- "Hebbal to Kempegowda International Airport in 20 minutes". The Times of India. 30 January 2014. Archived from the original on 8 July 2015. Retrieved 13 March 2016.
- "Drive to airport to be smoother by month-end". The Hindu. 2 January 2014. Archived from the original on 18 April 2014. Retrieved 10 March 2016.
- "Two alternate roads from the east to the airport by March 2017". The Hindu. 18 October 2016. Archived from the original on 7 November 2021. Retrieved 18 October 2016.
- "Driving to and from the Airport". Bengaluru Airport. Archived from the original on 13 March 2016. Retrieved 13 March 2016.
- Urs, Anil (19 May 2016). "Ola signs pact with Kempegowda international airport". The Hindu Business Line. Archived from the original on 20 March 2018. Retrieved 20 May 2016.
- Ray, Aparajita (25 May 2016). "Uber too, gets space at Bengaluru international airport". The Times of India. Archived from the original on 14 August 2016. Retrieved 25 May 2016.
- "Vayu Vajra bleeds BMTC of Rs 5 lakh a day". Bangalore Mirror. 3 November 2008. Archived from the original on 3 April 2016. Retrieved 13 March 2016.
- Sastry, Anil Kumar (17 August 2015). "KSRTC to operate Flybus between Manipal and KIA". The Hindu. Archived from the original on 17 December 2016. Retrieved 12 March 2016.
- "Bengaluru-Kempegowda airport suburban train to finally start from Monday". The News Minute. 3 January 2021. Archived from the original on 3 January 2021. Retrieved 3 January 2021.
- "Trains between Bengaluru city and Kempegowda International Airport: All you need to know | Explained News,The Indian Express". Archived from the original on 25 January 2021. Retrieved 12 February 2021.
- "KIA Halt Station: Airport train, finally on track". Deccan Herald. 17 January 2020. Archived from the original on 27 February 2020. Retrieved 24 January 2020.
- "BMRCL will spend Rs 800 crore for infra for two Metro stations to airport, line will be ready by December 2024". The New Indian Express. 12 October 2021. Retrieved 8 November 2021.
- "Bangalore airport to Bangalore city Airport project". Retrieved 27 November 2021.
- "BMRCL will spend Rs 800 crore for infra for two Metro stations to airport, line will be ready by December 2024". Retrieved 27 November 2021.
- Philip, Christin Mathew (25 January 2022). "Finally,Namma Metro work on ORR-KIA line gains pace". The Times of India. Retrieved 25 January 2022.
- "Plans on to build high-speed rail link between Bengaluru city and airport: Basavaraj Bommai". Retrieved 27 November 2021.
- "Virgin Hyperloop to study feasibility of Bengaluru airport to city centre corridor". Retrieved 27 November 2021.
External links
Media related to Kempegowda International Airport at Wikimedia Commons
- Official website
- Vayu Vajra Bus Timings to and from BIAL