Line S1 (Taizhou Rail Transit)
Line S1 of the Taizhou Rail Transit is a suburban rapid transit line currently under construction in Taizhou that will be running from Taizhou Railway Station to Chengnan. It is expected to open in June 2022. The full line will be 41.8 kilometres long.
Line S1 | |
---|---|
S1 | |
Overview | |
Locale | Taizhou, Zhejiang, China |
Termini | Xiatang Renmin Road |
Stations | 15 |
Service | |
Type | Rapid transit |
System | Taizhou Rail Transit |
Operator(s) | Taizhou MTR corporation |
History | |
Opened | June 2022 |
Technical | |
Line length | 41.8 km (25.97 mi) |
Number of tracks | 2 |
Character | Underground and Elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines, AC 25 kV 50 Hz |
Operating speed | 160 km/h (maximum speed) |
Stations
Station name | Transfer | Distance km |
Location | |||
---|---|---|---|---|---|---|
English | Chinese | |||||
Taizhou Railway Station | 杭台高铁台州站 | |||||
Kaifa Avenue | 开发大道站 | |||||
Yintai City | 银泰城站 | |||||
Hongjia | 洪家站 | |||||
Shanghai North Street | 商海北街站 | |||||
Tengda Road | 腾达路站 | |||||
Passenger Transport South | 客运南站 | |||||
Zeguo | 泽国站 | |||||
Wenling Railway Station | 温岭火车站站 | S2 | ||||
Hengfeng | 横峰站 | |||||
Zhongxin Avenue | 中心大道站 | |||||
Chengxi | 城西站 | |||||
Wan Changlu | 万昌路站 | |||||
Wenling Stadium Road | 温岭体育场路站 | |||||
Chengnan | 城南站 | |||||
References
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.