Line 12 (Beijing Subway)

Line 12 of the Beijing Subway (Chinese: 北京地铁12号线; pinyin: běijīng dìtiě shí'èr hàoxiàn) is rapid transit line under construction in Beijing.[4] The line is 29.6 km (18.4 mi) with 21 stations. It is fully underground.[3] The line between Sijiqing and Dongfeng will be opened in 2023, due to planning adjustments east of Dongfeng.[1][2]

Line 12
 12 
Construction site of Changchunqiao station in September 2017
Overview
Other name(s)M12 (planned name)
StatusUnder Construction
TerminiSijiqing
Guanzhuangluxikou
Stations21
Service
TypeRapid transit
SystemBeijing Subway
Rolling stock8-car Type A
History
Planned opening2023 (planned)[1][2]
Technical
Line length29.6 km (18.4 mi)
CharacterUnderground[3]
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed80 km/h (50 mph)
Route map

Tiancun yard
Yongding River diversion canal
Sijiqing
Yuandalu
Changchunqiao
outer – inner
Jingmi diversion canal
Suzhouqiao
Renmin Univ.
Dazhongsi
Jingzhang ICR Qinghuayuan tunnel
Xiaoyue river
Jimenqiao
Beitaipingzhuang
Madian
Anhuaqiao
Anzhenqiao
Heping Xiqiao
Guangximen
Dongtucheng ditch
Ba river
Xibahe
Line 17 (opens 2023)
JiahuihuFuture Science Park North
connects line 17
Capital Airport Express Beixinqiao
line 10 inner
Sanyuanqiao
line 10 outer
Capital Airport Express Terminal 3
Ba river
Fangyuanli
Gaojia Yuan
Jiuxianqiao
CR Track Test Center
(Beijing circular railway)
Beigangzi
Dongba depot
Dongfeng
Beixiao river
Guanzhuangluxikou
Caogezhuang North

Stations

Station Name Connections Distance
km
English Chinese
Sijiqing 四季青
Yuandalu 远大路
Changchunqiao 长春桥  10 
Suzhouqiao 苏州桥  16 
Renmin Univ. 人民大学  4 
Dazhongsi 大钟寺  13 
Jimenqiao 蓟门桥  Changping 
Beitaipingzhuang 北太平庄  19 
Madian 马甸
Anhuaqiao 安华桥  8 
Anzhenqiao 安贞桥
Heping Xiqiao 和平西桥  5 
Guangximen 光熙门  13 
Xibahe 西坝河  17 
Sanyuanqiao 三元桥  10   Capital Airport 
Fangyuanli 芳园里
Gaojia Yuan 高家园  14 
Jiuxianqiao 酒仙桥      
Beigangzi 北岗子
Dongfeng 东风  3 
Guanzhuangluxikou 管庄路西口  3 

Rolling stock

The line will use 8-car Type A rolling stock.

History

Line 12's route has undergone substantial changes on the planners' drawing board. In the late 1990s, one draft of the subway plan showed Line 12 running from the Beijing South railway station to Huangcun.[5] The Beijing South railway station was then built with subway platforms for only Lines 4 and 14. The old plan of Line 12 is cancelled now.

A new plan of Line 12 was announced at January 2012.[6] In June 2012, there were several media reports listing the planned stations of the line. The final planning of the line started from Sijiqing in Haidian District east to Guanzhuangluxikou in Chaoyang District, following the northern Third Ring Road.[7] The entire line has 21 stations,[4] of which 15 will have transfers with other lines.[8] The line will provide relief for the northern arc of the congested Line 10 loop line.[4]