Supa Dam
Supa Dam is built across Kalinadi (Kannada) or Kali river in state of Karnataka in India and is the highest dam in Karnataka. The dam is situated at GaneshaGudi, which is in Joida taluk of Uttara Kannada district. The dam forms the main storage reservoir to all the power houses in Kalinadi hydro power project of total installed capacity of 1180MW, which includes main Nagzari power house of 810 MW capacity. The power house at the foot of the dam has two 50 MW electricity generators. The electricity generated is supplied to different parts of Karnataka. The dam was built by Hindustan Steel Works Construction Limited and is designed, owned and operated by Karnataka Power Corporation Limited. The power house was commissioned in 1985.
Joida | |
---|---|
![]() The Back waters of Supa Dam. | |
![]() ![]() Location of Joida in Karnataka ![]() ![]() Supa Dam (India) | |
Country | India |
Location | Joida |
Coordinates | 15°16′34″N 74°31′36″E |
Status | Operational |
Construction began | 1974 |
Opening date | 1987 |
Dam and spillways | |
Type of dam | Concrete gravity |
Impounds | Kalinadi River |
Height | 101 m (331 ft) |
Length | 332 m (1,089 ft) |
Reservoir | |
Total capacity | 4,178,000,000 m3 (3,387,160 acre⋅ft) |
Active capacity | 4,115,000,000 m3 (3,336,085 acre⋅ft) |
Catchment area | 1,057 km2 (408 sq mi) |
Power Station | |
Commission date | 1985 |
Hydraulic head | 72 m (236 ft) (design) |
Turbines | 2 x 50 MW Francis-type |
Installed capacity | 100 MW |