Northern Link (MTR)

The Northern Link is a proposed rapid transit line of the MTR[1] system of Hong Kong which would connect the Tuen Ma line and the Lok Ma Chau Spur Line of the East Rail line. The link would also serve as a connection to the border checkpoint to mainland China for passengers to and from the western New Territories.[2] The Northern Link would start at Kam Sheung Road and end at Lok Ma Chau and Kwu Tung, and would be constructed either as a direct shuttle or with intermediate stations.

Northern Link
北環綫
Overview
OwnerKowloon-Canton Railway Corporation
LocaleDistricts: Yuen Long
TerminiKam Sheung Road
Lok Ma Chau / Kwu Tung
Stations5
Service
SystemMTR
Operator(s)MTR Corporation
History
Planned opening2034 (2034)
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Kwu Tung     
proposed extension
proposed spur line to Huanggang Port
San Tin
Ngau Tam Mei
Au Tau
Kam Sheung Road     
Pat Heung Depot
Northern Link
Traditional Chinese北環綫
Simplified Chinese北环线

Other benefits for constructing this project are that it would significantly cut journey times for certain trips (for example from Yuen Long to Fanling) 2020: approx. 20 stations When it is completed: approx. 5 stations and significantly reduce costs for these trips, and also relieve the large number of passengers using the East Rail line by diverting some passengers to the West Rail line (now known as the Tuen Ma line).

According to the Railway Development Strategy 2014, a shuttle service between Kam Sheung Road station and Kwu Tung station spanning 10.7 km (6.6 mi) is expected to begin construction in 2018 and be inaugurated in 2023.[3] Construction of Kwu Tung station is scheduled to commence in 2023 with completion due in 2027 while construction of the mainline is planned to begin in 2025 and be completed in 2034.[4]

Land hoarding

In July 2021, Liber Research Community found that developers had begun to hoard land alongside the Northern Link line, buying at least 80 hectares of land near the line.[5]

Stations

Development of Northern Link was mentioned in the 2021 Policy Address, which a spur line and an extension would be built
Station Name Connections Opening date District
English Chinese
Kam Sheung Road 錦上路      Tuen Ma line 20 December 2003 Yuen Long
Au Tau 凹頭 2034
Ngau Tam Mei 牛潭尾
San Tin 新田
Kwu Tung 古洞      East Rail line 2027 North
Eastern Extension
Lo Wu South 羅湖南      East Rail line N/A North
Man Kam To 文錦渡
Lo Shue Ling 老鼠嶺
Heung Yuen Wai 香園圍
Ta Kwu Ling 打鼓嶺
Ping Che 坪輋
Queen's Hill 皇后山
On Lok Tsuen 安樂村
Northern Link Spur Line
San Tin 新田 2034 North
Chau Tau 洲頭 N/A
HK-SZ Innovation and Technology Park 港深創科園
Huanggang 皇崗

References

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.