Ranjiaba station

Ranjiaba is a station on Line 5, Line 6, and the Loop Line of Chongqing Rail Transit in Chongqing Municipality, China.[1][2] It is located in Yubei District and serves its surrounding area, including nearby office towers, residential blocks and a mall.

Ranjiaba

冉家坝
Loop Line platform (Anti-Clockwise Loop)
General information
LocationChongqing
China
Operated byChongqing Rail Transit Corp., Ltd
Line(s) Loop 5 6
Platforms6 (2 island platforms and 2 side platforms)
Connections
Construction
Structure typeBelow ground
Disabled accessYes
Other information
Station code0/11, 5/08, 6/15
History
Opened
  • January 20th 2013(Line 6)
  • December 28, 2017 (Line 5 services added)
  • December 28, 2018 (Loop Line expansion)
Services
Preceding station Chongqing Rail Transit Following station
Xingfu Square Line 5 Dalongshan
towards Tiaodeng
Dalongshan
towards Chayuan
Line 6 Guangdianyuan
towards Beibei
Sports Park
Counter-clockwise
Loop line Dongbu Park
Clockwise

It opened on January 20th, 2013 with Line 6.

Line 5 services were later added on December 28th, 2017. The station expanded exactly 1 year later with the opening of the Loop Line section of the station on 28th of December 2018.

Exit and transfer directories at a Loop Line platform
Transfer directories for cross-platform interchange and opposite direction trains of the Line 5/Line 6 island platform on B2

Station Structure

Loop Line Platforms

Platform Layout

There are 2 side platforms for Loop Line trains.

Side Platform Doors open on the right
To Loop Sports Park 环/11

Counter-clockwise loop
Clockwise loop 环/11

To Loop Dongbu Park
Side Platform Doors open on the right

Line 5 & Line 6 Platforms

Platform Layout

A total of 2 island platforms are used for Line 5 and Line 6 trains travelling in both directions.

These 2 platforms were designed with cross-platform interchange in mind and were built during the construction of Line 6. Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.

Island Platform on B2

To 6 Beibei 6/15

Doors open on the left

Doors open on the right

To 5 The EXPO Garden Center 5/08

Island Platform on B3

6/15

To 6 Chayuan
Doors open on the right

Doors open on the left

5/08

To 5 Dashiba