Ranjiaba station
Ranjiaba is a station on Line 5, Line 6, and the Loop Line of Chongqing Rail Transit in Chongqing Municipality, China.[1][2] It is located in Yubei District and serves its surrounding area, including nearby office towers, residential blocks and a mall.
Ranjiaba 冉家坝 | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() Loop Line platform (Anti-Clockwise Loop) | |||||||||||||||||||||
General information | |||||||||||||||||||||
Location | Chongqing China | ||||||||||||||||||||
Operated by | Chongqing Rail Transit Corp., Ltd | ||||||||||||||||||||
Line(s) | ![]() | ||||||||||||||||||||
Platforms | 6 (2 island platforms and 2 side platforms) | ||||||||||||||||||||
Connections | ![]() | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Structure type | Below ground | ||||||||||||||||||||
Disabled access | Yes | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Station code | 0/11, 5/08, 6/15 | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened |
| ||||||||||||||||||||
Services | |||||||||||||||||||||
|
It opened on January 20th, 2013 with Line 6.
Line 5 services were later added on December 28th, 2017. The station expanded exactly 1 year later with the opening of the Loop Line section of the station on 28th of December 2018.


Station Structure
Loop Line Platforms
- Platform Layout
There are 2 side platforms for Loop Line trains.
Side Platform Doors open on the right | ||||
To Loop Sports Park | ← | 环/11 | ← | Counter-clockwise loop |
---|---|---|---|---|
Clockwise loop | → | 环/11 | → | To Loop Dongbu Park |
Side Platform Doors open on the right |
Line 5 & Line 6 Platforms
- Platform Layout
A total of 2 island platforms are used for Line 5 and Line 6 trains travelling in both directions.
These 2 platforms were designed with cross-platform interchange in mind and were built during the construction of Line 6. Spaces on the opposite end of the platforms were reserved for Line 5 at the time and came into use when the metro line became operational in 2017.
Island Platform on B2
To 6 Beibei | ← | 6/15 | ← | ||
---|---|---|---|---|---|
Doors open on the left
Doors open on the right |
|||||
To 5 The EXPO Garden Center | ← | 5/08 | ← |
Island Platform on B3
→ | 6/15 | → | To 6 Chayuan | ||
---|---|---|---|---|---|
Doors open on the right
Doors open on the left |
|||||
→ | 5/08 | → | To 5 Dashiba |