Purwakarta–Cileunyi Toll Road

Purwakarta–Cileunyi Toll Road or Purbaleunyi Toll Road is a toll road in Indonesia, connecting Purwakarta Regency, West Bandung, Cimahi and the city and regency of Bandung.

Purwakarta–Cileunyi Toll Road
Purbaleunyi Toll Road
Route information
Part of AH2
Maintained by PT Jasa Marga Tbk
Length88 km (55 mi)
Existed1989–present
HistoryOpened in 1989–1992 (km 122–155) and 2003–2005 (km 67–122)
Major junctions
North endDawuan Interchange
Major intersections
South endCileunyi
Location
CountryIndonesia
Major citiesPurwakarta Regency, West Bandung, Cimahi, Bandung City, Bandung Regency
Highway system

Before fully connected, this toll road segment was Padalarang–Cileunyi only. From 2003 until 2005, the segment of Cikampek–Padalarang was constructed. Since then, this toll road is part of Jakarta–Cikampek Toll Road. The junction of both toll roads is at kilometre 67. This toll road is famous for its mountain views, traffic jams on holidays, and accidents.

Kilometres 67–122

The Purbaleunyi toll road starts from kilometre 67. This section is known as Cipularang. It has a length of 58 kilometres (36 mi). It connects Purwakarta Regency and West Bandung. Because this road runs to a hill without any electricity, solar powered street lights have been installed. This section is famous for accidents, especially around kilometre 97. This section ends at Padalarang.

For technical aspects, Cipularang Toll Road has 2 lanes in each direction (with some little segments having a climbing lane for heavy vehicles). Unfortunately, this toll road sometimes closed for heavy vehicles traffic due to the difficult terrain to repair its condition. The famous event for this closure is Cisomang Bridge pillars break.

This toll road holds the record of longest exit-to-exit spans in Indonesia with Padalarang to Jatiluhur spans for 38 km without any other exits (for southbound) before being surpassed by Terbanggi Besar-Pematang Panggang-Kayuagung Toll Road in Sumatra, where the spans between Pematang Panggang and Kayuagung spans 91 km (KM239-KM330) without any exits between them.

Kilometres 122–155

This section is known as Padaleunyi. It has length of 33 kilometres (21 mi) for mainline and a grand total of 7.7 kilometres (4.8 mi) for Bandung City Main Links (5 kilometres (3.1 mi) in Pasteur Link and 2.7 kilometres (1.7 mi) in Pasir Koja link). It crosses South Bandung, also acts as the third southern ring roads of Bandung Metropolitan Areas ; the second ring road is Soekarno-Hatta Street, Bandung, while the first ring road consists of many city roads. It ends at Cileunyi, although there's an extension project to go to Sumedang and Kertajati International Airport via Cisumdawu Toll Road. For the future term this toll road will be a main line for southern Java toll roads network (from Bogor to Yogyakarta ), so government might have planned a new toll road pararelling Padaleunyi Toll Road, or this toll road will be the same fate as Jakarta-Cikampek Toll Road (where the elevated expressway builds top of this toll road).

There are three rest areas : KM125 Jakarta-bound, KM147 Cileunyi-bound, and KM149 Jakarta-bound. The mainline has three lanes in each direction; the links have 2 lanes in each direction. Famous destinations are:

From KM125 to KM150, Jakarta-Bandung High Speed Railway pararels this toll road.

Facilities

Rest areas

Note that the toll road goes east-west from KM122-KM155, while from KM67-KM122, the direction is suggested south-north.

KMDirectionToiletMosqueRestaurantConvenience StoreATMGas StationRest Area
72NorthboundYYYYYYY
72SouthboundYYYYYYY
88NorthboundYYYYYYY
88SouthboundYYYYYYY
97NorthboundYYYYYYY
125WestboundYYYYYYY
147 Eastbound Y Y Y Y Y Y Y
149 Westbound Y Y Y Y Y Y Y

Toll gate

KMToll gate/interchangeDestination
67Dawuan InterchangeJakarta–Cikampek Toll Road
Cikopo-Palimanan Toll Road
Karawang
Jakarta
Cirebon
76SadangSadang
Purwakarta
Subang
84JatiluhurJatiluhur
Purwakarta
Ciganea
116CikamuningCikamuning
Cikalong Wetan
Purwakarta (Northbound only).
120Padalarang BaratFormer central toll gate, replaced by Kalihurip Utama near Kalihurip Interchange (connects with Jakarta–Cikampek Toll Road).
122Padalarang TimurPadalarang
Sukabumi
Cianjur
Kota Baru Parahyangan
127PasteurCimahi
Pasteur
Lembang
Bandung Inner Toll Road
132Pasir KojaPasir Koja
Leuwipanjang
Soreang–Pasir Koja Toll Road
135KopoKopo
Soreang
Ciwidey
139Mohammad TohaMohammad Toha
Banjaran
Pangalengan
142Buah BatuBuah Batu
Majalaya
Dayeuhkolot
149Gedebage (Planned)Gedebage, Majalaya
Gedebage-Tasikmalaya Toll Road
Bandung Inner Toll Road
155CileunyiCileunyi
Sumedang
Majalengka
Cisumdawu Toll Road (Planned)
KMToll GateDestination
51DBarosBaros
Cimahi
Leuwigajah
51APasteurPasteur
Dago
Lembang

Interchanges (expressway-to-expressway connections)

KMLocationConnected with
67DawuanJakarta–Cikampek Toll Road
120-121 Padalarang Sukabumi-Ciranjang-Padalarang Toll Road (planned)
132Pasir KojaSoreang–Pasir Koja Toll Road
149GedebageBandung Inner Toll Road (Planned)

Gedebage-Tasikmalaya Toll Road (planned)

155CileunyiCisumdawu Toll Road (under construction)

Bridges

KMNameLength
95Ciujung550 metres
101Cisomang252 metres
110Cikubang500 metres
110Cipada720 metres
117Cimeta400 metres

See also

This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.