Nuclear power in Russia

Russia is one of the world's largest producers of nuclear energy. In 2020 total electricity generated in nuclear power plants in Russia was 215.746 TWh, 20.28% of all power generation.[1] The installed gross capacity of Russian nuclear reactors is 29.4 GW in December 2020.

Recent history

In accord with legislation passed in 2001, all Russian civil reactors are operated by Energoatom. More recently in 2007 Russian Parliament adopted the law "On the peculiarities of the management and disposition of the property and shares of organizations using nuclear energy and on relevant changes to some legislative acts of the Russian Federation", which created Atomenergoprom - a holding company for all Russian civil nuclear industry, including Energoatom, nuclear fuel producer and supplier TVEL, uranium trader Tekhsnabexport (Tenex) and nuclear facilities constructor Atomstroyexport.

Global status of nuclear deployment as of 2017 (source: see file description)
  Operating reactors, building new reactors

The overnight cost of construction in the seventies was a low 800 $/kW in 2016 dollars.[2] In 2019 a S&P Global Ratings report stated Russia's nuclear construction costs were well below European levels because of vertical integration, good learning-curve effects from serial production, and the large currency devaluation of 2014.[3]

The Russian nuclear industry employs around 200,000 people.[4] Russia is recognized for its nuclear disaster expertise and for the safety of its technology. Statements made in review of Russian reactor safety [8] that "Requirements on placing the nuclear installation should not contain additional restrictions in comparison with other industrial facilities," suggest that nuclear plants could be placed within cities and are not considered to pose exceptional dangers. https://www.jstor.org/stable/1396196[5][6][7][8] Russia is also pursuing an ambitious plan to increase sales of Russian-built reactors overseas,[9] and had 39 reactors under construction or planned overseas as of 2018.[10]

The VVER-1200 pressurised water reactor is the system currently offered for construction, being an evolution of the VVER-1000 with increased power output to about 1200 MWe (gross) and providing additional passive safety features.[11] In August 2016 the first VVER-1200, Novovoronezh II-1, was connected to the grid.[12]

Through its membership in the multi-nation ITER project, Russia participates in the design of nuclear fusion reactors.

In 2013 the Russian state allocated 80.6 billion rubles ($2.4 billion) toward the growth of its nuclear industry, especially export projects where Russian companies build, own and operate the power station, such as the Akkuyu Nuclear Power Plant.[13]

In 2016 initial plans were announced to build 11 new nuclear power reactors by 2030, including the first VVER-600, a smaller two cooling circuit version of the VVER-1200, designed for smaller regions and markets.[14] Outline plans for near-surface disposal facilities for low and intermediate-level waste, and deep burial disposal facilities for high-level waste were also approved in the Krasnoyarsk Krai region.[14]

In October 2017 Rosatom was reported to be considering postponing commissioning new nuclear plants in Russia due to excess generation capacity and that new nuclear electricity prices are higher than for existing plant. The Russian government is considering reducing support for new nuclear under its support contracts, called Dogovor Postavki Moshnosti (DPM), which guarantee developers a return on investment through increased payments from consumers for 20 years.[15] In 2019 a S&P Global Ratings report stated that "We expect domestic nuclear capacity to increase only moderately because electricity demand in Russia is stagnating, given only modest GDP growth, a significant potential for energy savings, and the government's intention to avoid raising electricity prices through additional increases in capacity payments".[3]

Russia's first-floating nuclear power plant, Akademik Lomonosov, is equipped to provide power to a remote Russian town on the Bering Strait. The nuclear unit features small modular reactors (SMRs) technology.[16]

Nuclear power reactors

Reactors in operation

Nuclear power plants in Russia (view)
 Active plants
 Closed plants
 Unfinished plants
 Plants under construction

Eleven of Russia's reactors are of the RBMK 1000 type, similar to the one at Chernobyl Nuclear Power Plant. Some of these RBMK reactors were originally to be shut down but have instead been given life extensions and uprated in output by about 5%. Critics say that these reactors are of an "inherently unsafe design", which cannot be improved through upgrades and modernization, and some reactor parts are impossible to replace. Russian environmental groups say that the lifetime extensions "violate Russian law, because the projects have not undergone environmental assessments".[17]

Control room of a VVER-1000 in 2009, Kozloduy Unit 5
List of nuclear reactors in Russia [ view/edit ]
Name Unit
No.
Reactor Status Net capacity (MW) Construction start Commercial operation Closure
TypeModel
Akademik Lomonosov1PWRKLT-40SOperational3215 April 200719 December 2019[18]
2PWRKLT-40SOperational3215 April 200719 December 2019
Balakovo1PWRVVER-1000Operational9501 December 198023 May 1986
2PWRVVER-1000Operational9501 August 198118 January 1988
3PWRVVER-1000Operational9501 November 19828 April 1989
4PWRVVER-1000Operational9501 April 198422 December 1993
5PWRVVER-1000Unfinished95028 December 1992
6PWRVVER-1000Unfinished95028 December 1992
Bashkir1PWRVVER-1000Unfinished95019801991
2PWRVVER-1000Unfinished95019801991
3PWRVVER-1000Unfinished95019801991
4PWRVVER-1000Unfinished95019801991
Beloyarsk1LWGRAMB-100Shut down1021 June 195826 April 19641 January 1983
2LWGRAMB-200Shut down1461 January 19621 December 19691 January 1990
3SFRBN-600Operational5601 January 19691 November 1981
4SFRBN-800Operational78918 July 200610 December 2015
5SFRBN-1200Planned1100
Bilibino1LWGREGP-6Shut down111 January 19701 April 197414 January 2019
2LWGREGP-6Operational111 January 19701 February 1975
3LWGREGP-6Operational111 January 19701 February 1976
4LWGREGP-6Operational111 January 19701 January 1977
Dimitrovgrad1FBRSVBR-100Planned90
Gorky1PWRAST-500Unfinished50019821993
2PWRAST-500Unfinished50019821993
Kalinin1PWRVVER-1000Operational9501 February 197712 June 1985
2PWRVVER-1000Operational9501 February 19823 March 1987
3PWRVVER-1000Operational9501 October 19858 November 2005
4PWRVVER-1000Operational9501 August 198625 December 2012
Kaliningrad1PWRVVER-1200Under construction
(suspended)[19]
110922 February 2012
2PWRVVER-1200Planned1109
Kola1PWRVVER-440 V-230Operational4411 May 197028 December 1973
2PWRVVER-440 V-230Operational4411 May 197021 February 1975
3PWRVVER-440 V-213Operational4411 April 19773 December 1982
4PWRVVER-440 V-213Operational4411 August 19766 December 1984
Kola II[19][20]1PWRVVER-S-600Planned600(2028)(2034)
2PWRVVER-S-600Planned600(2028)(2034)
Kostroma[19][21]1PWRVVER-1200Unfinished; restart planned130019791990
2PWRVVER-1200Unfinished; restart planned130019791990
3PWRVVER-1200Unfinished; restart planned130019791990
4PWRVVER-1200Unfinished; restart planned130019791990
5LWGRRBMKP-2400Unfinished19861986
6LWGRRBMKP-2400Unfinished19861986
Kursk1LWGRRBMK-1000Shut down9251 June 197212 October 197719 December 2021
2LWGRRBMK-1000Operational9251 January 197317 August 1979
3LWGRRBMK-1000Operational9251 April 197830 March 1984
4LWGRRBMK-1000Operational9251 May 19815 February 1986
5LWGRRBMK-1000Unfinished/In state of conservation9251 December 19852012
6LWGRRBMK-1000Unfinished9251 August 1986
Kursk II1PWRVVER-TOIUnder construction111529 April 2018
2PWRVVER-TOIUnder construction111515 April 2019[22]
3PWRVVER-TOIPlanned1115
4PWRVVER-TOIPlanned1115
Leningrad1LWGRRBMK-1000Shut down9251 March 19701 November 197421 December 2018[23]
2LWGRRBMK-1000Shut down9251 June 197011 February 197610 November 2020
3LWGRRBMK-1000Operational9251 December 197329 June 1980
4LWGRRBMK-1000Operational9251 February 197529 August 1981
Leningrad II1PWRVVER-1200Operational108525 October 200829 October 2018
2PWRVVER-1200Operational108515 April 201022 March 2021[24]
3PWRVVER-1200[25]Planned1085
4PWRVVER-1200[25]Planned1085
MPEB #1[26][27] 1PWRRITM-200SPlanned53(2027)
2PWRRITM-200SPlanned53(2027)
MPEB #2[26][27] 1PWRRITM-200SPlanned53(2027)
2PWRRITM-200SPlanned53(2027)
MPEB #3[26][27] 1PWRRITM-200SPlanned53(2028)
2PWRRITM-200SPlanned53(2028)
MPEB #4[26][27] 1PWRRITM-200SPlanned53(2031)
2PWRRITM-200SPlanned53(2031)
Nizhny Novgorod1PWRVVER-1200Planned1300
2PWRVVER-1200Planned1300
3PWRVVER-1200Planned1300
4PWRVVER-1200Planned1300
Novovoronezh1PWRVVER-440 V-120Shut down1971 July 195731 December 196416 February 1988
2PWRVVER-440 V-120Shut down3361 June 196414 April 197029 August 1990
3PWRVVER-440 V-179Shut down3851 July 196729 June 197225 December 2016
4PWRVVER 440 V-179Operational3851 July 196724 March 1973
5PWRVVER-1000Operational9501 March 197420 February 1981
Novovoronezh II1PWRVVER-1200Operational111424 June 200827 February 2017
2PWRVVER-1200Operational111412 July 20096 November 2019
3PWRVVER-1200Planned1175
4PWRVVER-1200Planned1175
Obninsk1LWGRAM-1Shut down51 January 19511 December 195429 April 2002
Rostov1PWRVVER-1000Operational9501 September 198125 December 2001
2PWRVVER-1000Operational9501 May 198310 December 2010
3PWRVVER-1000Operational95015 September 200927 December 2014
4PWRVVER-1000Operational101116 June 201028 September 2018
Sakha1PWRRITM-200NPlanned45(2024)[28](2028)
2PWRRITM-200NPlanned45(2024)(2028)
Seversk1FBRBREST-300Under construction2808 June 2021[29](2026)
South Urals1FBRBN-1200Unfinished; restart planned110019821993
2FBRBN-1200Unfinished; restart planned110019821993
3FBRBN-1200Unfinished; restart planned110019821993
Smolensk1LWGRRBMK-1000Operational9251 October 197530 September 1983
2LWGRRBMK-1000Operational9251 June 19762 July 1985
3LWGRRBMK-1000Operational9251 May 198412 October 1990
4LWGRRBMK-1000Unfinished925
5LWGRRBMK-1000Unfinished925
6LWGRRBMK-1000Unfinished925
Smolensk II1PWRVVER-TOI[25]Planned1300
2PWRVVER-TOIPlanned1300
3PWRVVER-TOIPlanned1300
4PWRVVER-TOIPlanned1300
Tatar1PWRVVER-1200Unfinished; restart planned130019801990
2PWRVVER-1200Unfinished; restart planned130019801990
3PWRUnfinished19801990
4PWRUnfinished19801990
Voronezh1PWRAST-500Unfinished5009 January 19835 July 1990
2PWRAST-500Unfinished5009 January 19835 July 1990

International NPP projects in the Russian nuclear industry

Country NPP Reactor Type MWe net MWe gross Construction start Commercially operational
Turkey Akkuyu-1/2/3/4 VVER-1200/491 1115 1200 2016 (1st block) 2023 (1st block)
Bangladesh Ruppur-1 VVER-1200/523 1080 1200 2017-11-30 2023
Ruppur-2 VVER-1200/523 1080 1200 2018-07-14 2024
Belarus Belarusian-1 VVER-1200/491 1115 1200 2013-11-06 2019
Belarusian-2 VVER-1200/491 1115 1200 2014-06-03 2020
Iran Bushehr-1 VVER-1000/446 915 1000 1975-05-01 (1995) 2013-09-23
Bushehr-2 VVER-1000/446 915 1000 2016-09-10 2025
Bushehr-3 VVER-1000/446 915 1000 2016-09-10 2027
India Kudankulam-1 VVER-1000/412 917 1000 2002-03-31 2013-10-22
Kudankulam-2 VVER-1000/412 917 1000 2002-07-04 2016-07-10
Kudankulam-3/4 VVER-1000/412 917 1000 negotiation
Slovakia Mochovce-3/4 VVER-440 440 471 1987-01-27, stopped 1991, restarted 2008-11-03[30] 2020 (estimated)
Vietnam Ninh Thuan 1-1/2 VVER-1000/428 950 1000 cancelled cancelled
Ninh Thuan 1-3/4 VVER-1000/428 950 1000 cancelled
China Tianwan-1 VVER-1000/428 990 1060 1999-10-20 2007-05-17
Tianwan-2 VVER-1000/428 990 1060 2000-10-20 2007-08-16
Tianwan-3 VVER-1000/428М 1050 1126 2012-12-27 2018
Tianwan-4 VVER-1000/428М 1050 1126 2013-09-27 2018
Ukraine Khmelnytskyi-3/4 VVER-1000/392B 950 1000 cancelled cancelled
Finland Hanhikivi-1 VVER-1200/AES-2006 1200 earliest 2021 estimated 2028

In addition Atomstroyexport challenging NPP projects list contains:[31]

Nuclear engineering companies

  • Atomenergomash: power engineering company; produces steam generators for NPPs
  • Atommash: by far Russia's largest nuclear engineering company designed to build up to 8 reactors per year.
  • Atomstroyexport: nuclear power equipment and service export monopoly
  • OKBM Afrikantov: nuclear reactor design and engineering company. The world's leading company in production of fast breeder reactors.
  • OKB Gidropress: nuclear reactor design and engineering company

Safety

Russia, responding to the 2011 Japanese nuclear accidents, will perform a 'stress test' on all its reactors "to judge their ability to withstand earthquakes more powerful than the original design anticipated".[33]

See also

References

  1. "Rosatom State Atomiс Energy Corporation ROSATOM global leader in nuclear technologies nuclear energy". Archived from the original on 31 January 2021.
  2. USA. (1982). Technology and Soviet energy availability. Boulder (Colo.: Westview press. p. 126.
  3. "State support pivotal to Russia's nuclear sector, says report". World Nuclear News. 12 July 2019. Retrieved 12 July 2019.
  4. "Nuclear rethink urged". The Moscow News. 21 March 2011. Archived from the original on 19 November 2011.
  5. "Benchmarking the global nuclear industry 2012 Heading for a fast recovery" (PDF). Ernst & Young. 11 October 2012. Retrieved 13 October 2014.
  6. "Rosatom today and overview of its current and prospective Nuclear Power Plant projects" (PDF). Rosatom. 21 August 2013. Archived from the original (PDF) on 17 October 2014. Retrieved 13 October 2014.
  7. "International Standards of Safety and the Modern Projects of Nuclear Power Stations" (PDF). Rosatom. 4 November 2013. Archived from the original (PDF) on 18 October 2014. Retrieved 14 October 2014.
  8. "Russia's efforts to improve safety following the Chernobyl and the Fukushima accidents" (PDF). IBRAE. 6 November 2013. Retrieved 14 October 2014. {{cite web}}: External link in |publisher= (help)
  9. Pulitzer Center On Crisis Reporting
  10. "Russia leads the world at nuclear-reactor exports". The Economist. 7 August 2018. Retrieved 10 August 2018.
  11. Nikolay Fil (26–28 July 2011). "Status and perspectives of VVER Status and perspectives of VVER nuclear power plants nuclear power plants" (PDF). OKB Gidropress. IAEA. Retrieved 28 September 2011.
  12. "Russia connects Novovoronezh 6 reactor to grid". World Nuclear News. 5 August 2016. Retrieved 17 September 2016.
  13. "Russia invests in nuclear". World Nuclear News. 20 December 2013. Retrieved 21 December 2013.
  14. "Russia to build 11 new nuclear reactors by 2030". World Nuclear News. 10 August 2016. Retrieved 17 September 2016.
  15. "Rosatom considers delaying reactor commissioning". Nuclear Engineering International. 30 October 2017. Retrieved 6 November 2017.
  16. "Rosatom's floating nuclear power unit arrives in Chukotka, Russia". Power Technology | Energy News and Market Analysis. 15 September 2019. Retrieved 17 September 2019.
  17. Igor Koudrik and Alexander Nikitin (13 December 2011). "Second life: The questionable safety of life extensions for Russian nuclear power plants". Bulletin of the Atomic Scientists. Archived from the original on 25 March 2013. Retrieved 16 December 2011.
  18. "Rosatom State Atomic Energy Cooperation | ROSATOM's first of a kind floating power unit connects to isolated electricity grid in Pevek, Russia's Far East". rosatom.ru. Retrieved 1 January 2020.
  19. "Nuclear Power in Russia | Russian Nuclear Energy - World Nuclear Association". world-nuclear.org. Retrieved 14 May 2018.
  20. "Кольскую АЭС-2 начнут строить в 2028 году".
  21. Dollezhal N.A. At the origins of the man-made world: Notes of the designer - M .: Knowledge, 1989 - Academician's Tribune - 256s.(Доллежаль Н. А. У истоков рукотворного мира: Записки конструктора — М.: Знание, 1989 — Трибуна академика — 256с.)
  22. "The construction of the 2nd innovative VVER-TOI power block at the Kursk NPP-2 site has started ahead of schedule". rosenergoatom.ru. Retrieved 16 April 2019.
  23. "Russia retires Leningrad unit 1". World Nuclear News. World Nuclear Association. Retrieved 27 December 2018.
  24. "Unit 6 of Leningrad NPP commissioned for commercial operation". rosatom.ru. Retrieved 23 March 2021.
  25. "Four new npp units will be built in russia". rosatom-europe.com. Retrieved 26 June 2020.
  26. "Russia commits to further floating NPPs : New Nuclear - World Nuclear News". world-nuclear-news.org. Retrieved 28 July 2021.
  27. ""Росатом" и Kaz Minerals предварительно договорились о поставках электроэнергии для Баимского ГОКа". Interfax.ru (in Russian). Retrieved 3 September 2021.{{cite web}}: CS1 maint: url-status (link)
  28. "В Якутии собираются строить АЭС мощностью не менее 55 МВт". Sakhapress.ru.
  29. Сурикова, Маргарита (8 June 2021). "Росатом» начал строительство реактора Брест-300 в Северске". Известия.
  30. "Výstavba AE Mochovce 3&4 | Slovenské elektrárne - SEAS". Archived from the original on 19 August 2014.
  31. Challenging NPP Projects JSC ASE
  32. NPP JSC ASE (Jordan)