Line 2 (Lanzhou Metro)
Line 2 of the Lanzhou Metro is a subway line under construction in Lanzhou running from Yanbai Bridge[1] to Dongfanghong Square, has 9 stations and is 9.06 kilometres (5.63 mi) long.[3] An extension is planned to Xiahewan in Anning District.
| Line 2 | |
|---|---|
| 2 | |
| Overview | |
| Locale | Lanzhou, Gansu, China |
| Termini | Yanbai Bridge[1] Dongfanghong Square (Phase 1) |
| Stations | 9 |
| Service | |
| Type | Rapid transit |
| System | Lanzhou Metro |
| Operator(s) | Lanzhou Rail Transit Co., Ltd. |
| Rolling stock | 6-car Type A[2] |
| History | |
| Planned opening | 2022[2] |
| Technical | |
| Line length | 9.06 km (5.63 mi)[3] |
| Number of tracks | 2 |
| Character | Underground |
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
| Operating speed | 80 km/h[4] |
| Line 2 | |||||||
|---|---|---|---|---|---|---|---|
| Simplified Chinese | 兰州地铁2号线 | ||||||
| Traditional Chinese | 蘭州地鐵2號線 | ||||||
| |||||||
History
Line 2 was planned to start construction at the end of 2015.[5] Built in phases, the first phase is 9.06 kilometers (5.6 mi)[3] with 9 stations. It will run from Yanbai Bridge to Dongfanghong Square, all within Chengguan District. The line have 2 transfer stations to Line 1, at Wulipu station and Dongfanghong Square station. The line will open in 2022.[2]
In December 2017, tunnel boring for the second line commenced. The tunnel will be at depths between 6.3 metres (21 ft) and 16.8 metres (55 ft).[6]
Opening timeline
| Segment | Status | Length | Station(s) | Note |
|---|---|---|---|---|
| Yanbai Bridge — Dongfanghong Square | Under construction | 9.06 km (5.63 mi)[3] | 9 | Phase 1 |
Stations
| station name[1] | Transfer | Distance km |
Location | |||
|---|---|---|---|---|---|---|
| English | Chinese | |||||
| Yanbai Bridge | 雁白大桥 | 3 | 0.00 | 0.00 | Chengguan | |
| Junjiatan | 均家滩 | |||||
| Zhangsutan | 张苏滩 | |||||
| Wulipu | 五里铺 | 1 | ||||
| Tuanjiexincun | 团结新村 | |||||
| Hongxingxiang | 红星巷 | |||||
| Lanzhou Railway Station | 兰州火车站 | |||||
| Postal Building | 邮电大楼 | |||||
| Dongfanghong Square | 东方红广场 | 1 | 9.06 | |||
References
- "兰州地铁2号线7座车站有自己的"名字"啦".
- "轨道交通2号线一期工程建设进展顺利". 2021-04-28.
- "看看 兰州市轨道交通线网规划是啥样子?-兰州-每日甘肃网".
- 兰州阿豆 (30 January 2019). "兰州地铁一号线试乘手册出炉,不会坐地铁的都来看看_手机网易网". 3g.163.com.
- "Construction of subway line 2 expected to start soon". China.org.cn. Retrieved 17 December 2015.
- "微博". m.weibo.cn.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.