Airport Express (Hangzhou Metro)

The Airport Express line (simplified Chinese: 机场轨道快线; traditional Chinese: 機場軌道快線; pinyin: Jīchǎng Guǐdào Kuàixiàn) of the Hangzhou Metro, also known as the Central Express line (中轴快线; 中軸快線; Zhōngzhóu Kuàixiàn) or Line 19,[1] is an under construction rapid transit line in Hangzhou.[2][4][5] The line is expected to be operational in 2022.[3]

Airport Express
 Airport Express 
Train of the Airport Express
Overview
Other name(s)Central Express
Line 19[1]
Line K1
StatusUnder construction[2]
OwnerCity of Hangzhou
LocaleHangzhou, Zhejiang, China
TerminiTiaoxi
Yongsheng Road
Stations17 (13 underground, 4 elevated)[3]
Service
TypeRapid transit
SystemHangzhou Metro
Services1
Operator(s)Hangzhou Metro Corporation
Depot(s)Cangqian Depot
Jingjiang Stabling Yard
Rolling stock6-car Type A[2]
History
Planned opening2022[3]
Technical
Line length59.14 kilometres (36.75 mi)[3]
CharacterUnderground & Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead, 1500 V DC
Operating speed120 km/h (75 mph) (maximum speed)
Route map

Cangqian Depot
1
Tiaoxi
Wushanqiancun
2
West Railway Station
 3 
3
Chuangjing Road
 5 
 Yuhang Town  Guniangqiao 
4
Alibaba
district
Yuhang
Xihu
5
Xixi Wetland
6
Wulian
7
Wensan Road
 10 
 Huanglong Sports Center  Yisheng Road 
8
Shentangqiao
 2 
 Chaoyang  Liangzhu 
Line 3  Wushanqian / Shima  Xingqiao 
9
West Lake Cultural Square
 1   3 
Line 5 crossing
Genshanmen
Line 1 crossing
10
Yicheng Road
11
East Railway Station
 1   4  HGH
Line 6, Yuanbaotang
12
Yudao
 9 
 Guanyintang  Long'an 
13
Qianjiang'er Road
14
Xiaoshan Higher Education Park
15
Xiaoshan Science & Technology City
16
Xiaoshan International Airport
 1   7 
Line 1 towards Xianghu
17
Yongsheng Road
 7 
Jingjiang Stabling Yard

Description

The line has a length of 59.14 km (36.75 mi), including 47.1 km (29.3 mi) underground section.[3] There will be 17 stations on the line, including 13 underground stations and 4 elevated stations.[3] The line will use 6-car Type A rolling stock.[2]

It will connect Hangzhou West railway station, Alibaba headquarters, Hangzhou East railway station and Hangzhou Xiaoshan International Airport, and the termini will be Tiaoxi station and Yongsheng Road station. It will cross the Qiantang River on a rebuilt Road–Railway Bridge with the Huhangyong Expressway (Zhejiang Expressway S2).[6]

Stations

Station name Connections
Distance
km
Location
English Chinese
Tiaoxi 苕溪 0.00 0.00 Yuhang
West Railway Station 火车西站  3 
Hangzhou West
0.99
Chuangjing Road 创景路  5  3.56
Alibaba 阿里巴巴 5.79
Xixi Wetland 西溪湿地 10.91 Xihu
Wulian[7] 五联 --
Wensan Road 文三路  10  17.08
Shentangqiao 沈塘桥  2  19.01
West Lake Cultural Square 西湖文化广场  1   3  20.67 Gongshu
Yicheng Road[7] 驿城路 -- Shangcheng
East Railway Station 火车东站  1   4  6 [lower-alpha 1]
Hangzhou East
26.73
Yudao 御道  9  29.95
Qianjiang'er Road 钱江二路 32.53 Xiaoshan
Xiaoshan Higher Education Park 萧山高教园 37.27
Xiaoshan Science & Technology City 萧山科技城 41.07
Xiaoshan International Airport 萧山国际机场  1   7  HGH 50.98
Yongsheng Road 永盛路  7  54.74

Notes

  1. Out-of-station interchange with East Railway Station (East Square)

See also

References

  1. "开通400+ 今天上午11点,杭州地铁3、4、10号线,三线齐开".
  2. 15个站点全部开工 2022年建成 杭州机场轨道快线列入省重点建设项目. 2019-11-15.
  3. "杭州机场轨道快线车站部分效果图曝光 全线17座车站 预计明年6月开通". 2021-09-09. Archived from the original on 2021-10-22. 杭州机场轨道快线工程起点苕溪站,终点靖江站,线路长59.14公里,地下线长度47.105公里,高架段长度12.034公里,其中与杭甬高速合建10.266公里。全线共设车站17座,其中高架站4座,地下站13座
  4. 杭州地铁三期新增机场轨道快线、3号线北延、5号线西延. Zhejiang News. 6 March 2018.
  5. 杭州地铁中轴快线亚运会前建成 从仓前到机场只要45分钟. ZJNews. 22 December 2017.
  6. "新钱江二桥要来了 与亚运村连接 今后杭州将有10座跨钱塘江大桥!_浙江在线·住在杭州·新闻区". zzhz.zjol.com.cn. Retrieved 2019-02-08.
  7. "附件:杭州机场轨道快线工程站名一览表". Archived from the original on 2021-11-29.


This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.