Line 5 (Chongqing Rail Transit)

Line 5 of CRT is a rapid transit line in Chongqing, China, which opened on 28 December 2017.[3]

Line 5
5
The EXPO Garden Center Station platform
Overview
Native name重庆轨道交通5号线
StatusOperational
Line number5
LocaleChongqing, China
TerminiThe EXPO Garden Center (North) Shiqiaopu (South)
Dashiba (North) Tiaodeng (South)
Stations22
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017 (2017-12-28)
Technical
Line length16.42 km (10.20 mi)[1] (North section)
18.34 km (11.40 mi)[2] (South section)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Operating speed120 km/h (75 mph) (Peak)
Route map

Shizishan depot
Yuegangbeilu
Yuegang Avenue
Chunxuan Avenue
Central Park
Lujiagou
Ganyue Avenue
Yuhegou
The Expo Garden Center
3
Danhe
Huxiajie
Chongguang
Hemulu
Renhe
Dazhulin depot
Xingfu Square
Ranjiaba
Dalongshan
Dashiba
Zhongshutuo
Hongyancun Bridge
across Jialing River
Hongyancun
Xietaizi
Shiqiaopu
Shixinlu
Bashan
Fengxilu
Chongqing W
Railway Station
Loop line (ACW)
Huayan Temple
Huachenglu
Banshan
Zhongliangshan
Jinjianlu
Huayan Center
Zhongliangshan depot
Tiaodeng
Jiangtiao line to Shengquansi
=
Virtual interchange: transport
card only, re-entry required.

History

The line began construction on December 3, 2013.[4]

Opening timeline

SegmentCommencementLengthStation(s)Name
The EXPO Garden Center Dalongshan 28 December 2017 16.42 km (10.20 mi)[1] 9 Phase 1 (North Section)
Dalongshan Dashiba 24 December 2018 1
Shiqiaopu Tiaodeng 20 January 2021 18.34 km (11.40 mi)[2] 12 Phase 1 (South Section)

Stations

Phase I

Service
routes
Station
Station name Connections Distance
km
Location
E L English Chinese
5/01 The EXPO Garden Center 园博中心 0.00 Yubei
5/02 Danhe 丹鹤 1.35 1.35
5/03 Huxiajie 湖霞街 1.46 2.81
5/04 Chongguang 重光 15 (u/c) 1.67 4.48
5/05 Hemulu 和睦路 2.25 6.73
5/06 Renhe 人和 1.39 8.12
5/07 Xingfu Square 幸福广场 1.96 10.08
5/08 Ranjiaba 冉家坝 6 Loop 2.50 12.58
5/09 Dalongshan 大龙山 6 1.01 13.59
5/10 Dashiba 大石坝 4 (u/c) 2.51 16.1 Jiangbei
5/11 Zhongshutuo 忠恕沱
5/12 Hongyancun 红岩村 9 Yuzhong
5/13 Xietaizi 歇台子 1
18 (u/c)
Jiulongpo
5/14 Shiqiaopu 石桥铺 1
27 (u/c)
5/15 Shixinlu 石新路
5/16 Bashan 巴山
5/17 Fengxilu 凤西路 Shapingba
Through-service to/from Tangjiatuo via Loop line
5/18 Chongqing West 重庆西站 Loop Shapingba
5/19 Huayan Temple 华岩寺 Jiulongpo
5/20 Huachenglu 华成路
5/21 Banshan 半山
5/22 Zhongliangshan 中梁山
5/23 Jinjianlu 金建路
5/24 Huayan Center 华岩中心
5/25 Tiaodeng 跳磴 18 (u/c) Dadukou

Jiangtiao line

Jiangtiao line (江跳线)[5] or Jiangtiao section (江跳段) is the Southern extension of Line 5. The section from Tiaodeng to Shengquansi (28.22 km in length[5]) will open in 2022.[6] The section from Shengquansi to Dingshan (4.6 km in length[6]) is under planning.

Station
Station name Connections Distance
km
Location
English Chinese
5/25 Tiaodeng 跳磴 18 (u/c) Dadukou
5/26 Shilinsi 石林寺
5/27 Jiulongyuan 九龙园 Jiulongpo
5/28 Shuangfu 双福 Jiangjin
5/29 Xiangtang 享堂
5/30 Jiangjin Station[7] 江津高铁 Jiangjinbei Railway Station (planned)
5/31 Shengquansi 圣泉寺
5/32 Jijiang 几江
5/33 Dingshan 鼎山

Phase II

  • Under construction
Station
Station name Connections Distance
km
Location
English Chinese
Yuegangbeilu 悦港北路 Yubei
Yuegang Ave. 悦港大道
Chunxuan Ave. 椿萱大道
Central Park West 中央公园西 10
Lujiagou 鲁家沟
Ganyue Ave. 甘悦大道
Yuhegou 玉河沟

Notes

    References

    This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.