Kolkata Metro Line 3

Kolkata Metro Line 3 or the Purple Line is a line of the Kolkata Metro. As of 2021, the line is still under construction.[3] The route spans 15.246 kilometres (9.473 mi) from Joka in the south, to Esplanade in the north with an extension of 3.39 kilometres (2.11 mi) to Diamond Park from Joka.[4] It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.

Kolkata Metro Line 3

Joka-Esplanade Metro
Overview
StatusUnder construction
OwnerMetro Railway, Kolkata
Line number3
Locale Kolkata, India
TerminiDiamond Park (South)
Esplanade (North)
Connecting lines Blue Line   Green Line 
Stations14
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
History
Planned openingJoka to Taratala October in 2022
Technical
Line length15.246 kilometres (9.473 mi)

(10.246 kilometres (6.367 mi) (Under Construction)

5 kilometres (3.1 mi) (Planned))[1]
Number of tracks2
CharacterElevated and Underground
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC using third rail[2]
Operating speed80 km/h (designed)
Route map
Park Street
Victoria
Tolly Canal
Khidirpur
Mominpur
Majerhat metro station
Majerhat
Behala Bazar
Behala Chowrasta
Sakher Bazar
Thakurpukur
Joka
IIM
Diamond Park

Development

It is partially elevated and partially underground: around 8.5 kilometres (5.3 mi) of the project will be elevated and the rest 6.32 kilometres (3.93 mi) of the metro line will be underground.[3] The project is getting delayed due to non availability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.[5] Tenders for its construction and plant & machinery (M&P) were invited in April 2020.[6]

Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.

Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.

List of stations

The work has been sanctioned in 2010-11 for the new Metro line from Joka to B.B.D. Bagh for a length of 16.72 km at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at Esplanade. A separate Depot is under construction in Joka. It is being built by RVNL and the tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for 2 km has been sanctioned in the Budget of 2012-13 at a cost of Rs. 294.49 Cr. The execution of this work has been entrusted to RVNL.

There are 3 phases in this line-

  • Joka to Majerhat (Under construction)
  • Majerhat to Esplanade (After completion of phase 1)
  • Joka to Diamond park (After completion of phase 2)
Line 3
No. Station Name Location Phase Opening Connections Layout Coordinates Notes
English Bengali
1 Diamond Park ডায়মন্ড পার্ক Joka 3 Under Construction Vivekananda Mission School Bus Stop Elevated
2 IIM আইআইএম
3Joka জোকা 1Under construction Joka bus Depot

Diamond Park Bus Stop

Also known as Diamond Park
4Thakurpukur ঠাকুরপুকুর Thakurpukur

Thakurpukur Police Station Bus Stop

Thakurpukur Bazar Bus Stand

5Sakherbazar সখেরবাজার Behala

Thakurpukur Bus Depot

Silpara Bus Stop

Behala Sakherbazar Minibus Stand

Kadamtala Bus Stand

Also known as Silpara
6Behala Chowrasta বেহালা চৌরাস্তা

Behala Chowrasta Bus Stand

7Behala Bazar বেহালা বাজার

Behala Bazar Bus Stop

8Taratala তারাতলা Taratala

Ajanta Cinema Bus Stop

Taratala Bus Stand

Also known as Pathakpara
9Majerhat মাঝেরহাট Majerhat Majerhat Station

DH Road Mint Bus Stop

Majherhat Gurudwara Bus Stop

10Mominpur মোমিনপুর Mominpur Mominpore Bus Stop
11Kidderpore খিদিরপুর Kidderpore 2Planned (Tender Floats) Khidirpur Station

Khidderpore Crossing Tram Stop Khidderpore Bus Stop

Underground
12Victoria ভিক্টোরিয়া Maidan Hastings Tram Stop

Victoria Memorial Bus Stop

PG Hospital Bus Stop

Birla Planetarium Bus Stop

Also known as Hastings
13Park Street পার্ক স্ট্রিট Park Street Park Street Bus Stop

 Blue Line 

14Esplanade এসপ্ল্যানেড EsplanadeUnder Construction Blue Line 

 Green Line  (Under Construction)

Esplanade Bus Station(WBTC,SBSTC,NBSTC)

Esplanade Tram Depot

International Bus Terminus. Also known as Dharmatala / Chowringhee

See also

References

  1. "Kolkata Metro Map".
  2. "CAF to supply Kolkata metro trains". Railway Gazette. 9 September 2012. Retrieved 6 September 2018.
  3. B, Krishnendu; yopadhyay; Jun 10, Ajanta Chakraborty | TNN | Updated; 2019; Ist, 10:39. "Kolkata: Work on fast track as East-West Metro eyes new links in next two years | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.{{cite web}}: CS1 maint: numeric names: authors list (link)
  4. "Kolkata Metro Line 3".
  5. B, Krishnendu; Mar 1, yopadhyay | TNN | Updated; 2019; Ist, 11:11. "Work begins at Joka Metro depot, wall built | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.{{cite web}}: CS1 maint: numeric names: authors list (link)
  6. "RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot". The Metro Rail Guy. 28 April 2020. Retrieved 29 April 2020.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.