Datunludong station
Datunludong station[1] (simplified Chinese: 大屯路东站; traditional Chinese: 大屯路東站; pinyin: Dàtúnlù Dōng Zhàn) is an interchange station of Line 5 and Line 15 on the Beijing Subway.
![]() Line 5 platform | ||||||||||||||||
| General information | ||||||||||||||||
| Location | Beiyuan Road (北苑路) and Datun Road (大屯路) Chaoyang District, Beijing China | |||||||||||||||
| Operated by | Beijing Mass Transit Railway Operation Corporation Limited | |||||||||||||||
| Line(s) | ||||||||||||||||
| Platforms | 4 (1 island platform and 2 side platforms) | |||||||||||||||
| Tracks | 4 | |||||||||||||||
| Construction | ||||||||||||||||
| Structure type | Elevated (line 5) Underground (line 15) | |||||||||||||||
| Disabled access | Yes | |||||||||||||||
| History | ||||||||||||||||
| Opened | October 7, 2007 (line 5) December 26, 2015 (line 15) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| Location | ||||||||||||||||
![]() Datunludong Location in central Beijing | ||||||||||||||||
History

The line 5 station opened on October 27, 2007. It was too small to handle the interchange between line 5 and 15, so the line 15 station was left unopened when the western extension was opened in December 2014. From October to December 2015, the line 5 station was closed to widen the station and build a transfer corridor.[2] The line 15 station opened on December 26, 2015,[3] one year later than the other stations on the line.
Station Layout
The line 5 station has 2 elevated side platforms. The line 15 station has an underground island platform.
Exits
There are 6 exits, lettered A1, B1, B2, G, H1, and H2. Exits A1, B1, and H1 are accessible.
Gallery
Line 15 station hall
Line 15 platform
References
- "Jpg格式线路图下载 | 北京地铁官方网站".
- "10月17日起5号线蒲黄榆站、大屯路东站因换乘改造施工临时封站". Beijing Subway (in Chinese). Retrieved 2020-09-18.
- "两条地铁线今日试运营". Beijing Daily (in Chinese). Archived from the original on 2015-12-27. Retrieved 2020-09-18.

