Line 9 (Shanghai Metro)

Line 9 is a southwest-northeast line of the Shanghai Metro network. The line runs from Songjiang South Railway Station in Songjiang District to Caolu in Pudong. The line is colored light blue on system maps.

Line 9
An AC09 series train enters Songjiang University Town station.
Overview
Other name(s)R4 (planned name)
StatusOperational
LocalePudong; Huangpu, Xuhui, Minhang and Songjiang districts
Shanghai
TerminiSongjiang South Railway Station
Caolu
Stations35
Service
Type Rapid transit
System Shanghai Metro
Operator(s)Shanghai No.1 Metro Operation Co. Ltd.
Depot(s)Jiuting Depot;
Jinqiao parking lot
Rolling stock104 Type A 6-car trains
Daily ridership1.288 million (2019 peak)[1]
History
CommencedOctober 31, 2002 (2002-10-31)
OpenedDecember 29, 2007 (2007-12-29)
Last extensionDecember 30, 2017 (2017-12-30)
Technical
Line length63.8 km (39.64 mi)
Number of tracks2
CharacterUnderground, Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead lines (1500 volts)
Operating speed80 km/h (50 mph)
Average speed: 39.1 km/h (24 mph)
SignallingThales’ SelTracTM CBTC
Route map
Route on the Shanghai map:
To scale geographic map:

History

In the initial planning of Line 9, the entire line was from Fengjing to Chongming Island. Later, the plan to extend to Fengjing was cancelled, and the section to Chongming Island was changed to  Chongming .

The first phase of Line 9, from Songjiang Xincheng to Guilin Road stations, opened on December 29, 2007. It uses the Bombardier Movia trains which were lended to Line 1.

Line 9 did not directly connect to the rest of the Shanghai Metro network until the opening of the Line 9 portion of the Yishan Road station on December 28, 2008.[2] The station is an interchange between Lines 3 and 4. A shuttle bus conveyed passengers between Guilin Road and Yishan Road stations until construction was completed.

In December 2009, the second phase of Line 9 (from Yishan Road to Century Avenue) was completed, providing passengers with a direct link from Songjiang District in the west to Pudong in the east without having to transfer to other lines.

On April 7, 2010, the extension to Middle Yanggao Road Station was completed.

On December 30, 2012, the extension from Songjiang New City to Songjiang South Railway Station was opened.

On December 30, 2017, the line's east extension, consisting of 9 stations from Middle Yanggao Road to Caolu, entered operation.[3]

Shanghai Metro Line 9 opening history
SegmentCommencementLengthStation(s)Name
Songjiang Xincheng — Guilin Road 29 December 2007 29.013 km (18.03 mi) 12 Phase 1 (initial section)
Guilin Road — Yishan Road 28 December 2008 1.687 km (1.05 mi) 1 Phase 1 (final section)
Yishan Road — Century Avenue 31 December 2009 11.491 km (7.14 mi) 9 Phase 2 (initial section)
Century Avenue — Middle Yanggao Road 7 April 2010 2.435 km (1.51 mi) 1 Phase 2 (final section)
Songjiang South — Songjiang Xincheng 30 December 2012 6.474 km (4.02 mi) 3 Phase 3 (southern section)
Middle Yanggao Road — Caolu 30 December 2017 14.099 km (8.76 mi) 9 Phase 3 (eastern section)

Stations

Service routes

Shanghai Metro Line 9 service routes
Morning Peak Working Days: SheshanJinji Road
● Evening Peak Working Days & Extended Operations: SheshanMiddle Yanggao Road
Routes Station name Connections Distance Location Open-
ing
Plat-
form[4]
M P English Chinese km min
Songjiang South Railway Station 松江南站 IMH 0.00 0.00 0 Songjiang 30 Dec
2012[5]
Underground Island
Zuibaichi Park 醉白池 SAH 1.79 1.79 3
Songjiang Sports Center 松江体育中心  T1 

 T2 

1.73 3.53 6
Songjiang Xincheng 松江新城 1.58 5.15 9 29 Dec
2007[6]
Songjiang University Town 松江大学城  T2  2.64 7.75 12 Elevated Side
Dongjing 洞泾 3.38 11.13 17
Sheshan 佘山 2.20 13.34 20 Elevated Island
Sijing 泗泾 3.86 17.21 24 Elevated Side
Jiuting 九亭 6.24 23.45 31 Underground Island
Zhongchun Road 中春路 2.26 25.72 34 Minhang Underground Side & Island
Qibao 七宝 1.30 27.02 37 Underground Island
Xingzhong Road 星中路 1.88 28.90 40
Hechuan Road 合川路 1.85 30.76 43
Caohejing Hi-Tech Park 漕河泾开发区 1.33 32.09 45 Xuhui
Guilin Road 桂林路  15  2.03 34.12 48 Underground Side & Island
Yishan Road 宜山路  3   4  1.68 35.81 51 28 Dec
2008[7]
Underground Island
Xujiahui 徐家汇  1   11  1.50 37.32 53 31 Dec
2009[8]
Zhaojiabang Road 肇嘉浜路  7  1.38 38.70 56
Jiashan Road 嘉善路  12  1.06 39.77 58
Dapuqiao 打浦桥 0.87 40.64 60 Huangpu
Madang Road 马当路  13  0.84 41.48 62 Underground Side
Lujiabang Road 陆家浜路  8  0.94 42.43 64 Underground Island
Xiaonanmen 小南门 1.47 43.90 66
Shangcheng Road 商城路 2.39 46.30 70 Pudong
Century Avenue 世纪大道  2   4   6  0.97 47.28 72
Middle Yanggao Road 杨高中路  18  2.43 49.72 75 7 April
2010[9]
Fangdian Road 芳甸路 1.06 50.78 77 30 Dec
2017[10]
Lantian Road 蓝天路  14  2.12 52.90 80
Taierzhuang Road 台儿庄路 2.30 55.21 84
Jinqiao 金桥 1.54 56.75 86
Jinji Road 金吉路 1.69 58.45 89
Jinhai Road 金海路  12  1.02 59.47 91
Gutang Road 顾唐路 1.71 61.19 93
Minlei Road 民雷路 1.12 62.31 96
Caolu 曹路 1.50 63.82 98

Important stations

Future expansion

The east section is planned to extend one station to Caolu Railway station.[11]

Station name change

Headways

Shanghai Metro Line 9 headway
TimeSongjiang South Railway Station -
Sheshan
Sheshan -
Middle Yanggao Road/Jinji Road
Middle Yanggao Road/Jinji Road -
Caolu
Monday - Friday (Working Days)
Morning peak7:30–9:00Eastbound to Sheshan:
Average 3 minutes 50 seconds
Westbound to Songjiang South Railway Station:
About 5 minutes
Eastbound to Jinji Road:
Average 1 minutes and 50 seconds
Westbound to Sheshan:
About 2 minutes and 30 seconds
Eastbound to Caolu:
About 5 minutes and 30 seconds
Westbound to Jinji Road:
About 5 minutes
Off-peak9:00–17:00About 5 minutes and 30 seconds
Evening peak17:00–19:30Eastbound to Sheshan:
About 5 minutes
Westbound to Songjiang South Railway Station:
About 4 minutes and 30 seconds
Eastbound to Middle Yanggao Road:
About 3 minutes
Westbound to Sheshan:
About 2 minutes and 30 seconds
Middle Yanggao Road - Caolu
About 5 minutes
Other hours
First Train — 7:30
19:30 — Last Train
About 8 - 10 minutes
Saturday and Sunday (Weekends)
Peak hours8:00–20:00About 5 minutes
Other hours
First Train — 8:00
20:00 — Last Train
About 6 - 10 minutes
Extended operation (Friday and Saturday)
Extended Operation22:55–End of OperationSheshan - Middle Yanggao Road
15 - 20 minutes

Technology

Rolling Stock

Shanghai Metro Line 9 rolling stock
SetManufacturerTime of
manufac-
turing
TypeNo
of
car
Assembly[lower-alpha 1]SeriesNotes
10Bombardier Movia 4562004-2005A6Tc+Mp+M+M+Mp+Tc09A01Seconded from Line 1 (set AC04).
41Bombardier Movia 4562008-2010A6Tc+Mp+M+M+Mp+Tc09A025 trains (numbers 942-945, 948) used on Expo line for the World Expo in 2010, returned to line 9 afterwards.
36Bombardier Movia 4562016-2018A6Tc+Mp+M+M+Mp+Tc09A03
17CNR Changchun Railway Vehicles Co., Ltd.2018-2020A6Tc+Mp+M+M+Mp+Tc09A04
Shanghai Metro Line 9 former rolling stock
SetManufacturerTime in
oper-
ation
TypeNo
of
car
AssemblySetsNotes
1Shanghai Electric2007A6Tc+Mp+M+M+Mp+TcTrain number 0952 reassigned to be a special training vehicle.

One car (0952) manufactured in 2007 was mainly debugged for experimental purposes. It began trial operation with passengers on April 25, 2009, and will no longer be online in 2010. On December 20, 2011, the vehicle was retired from Line 9 and became a special training vehicle. It was transferred to the original Zhangjiang Hi-Tech Park of Line 2 to the newly built Longyang Road training line for subway staff training.

Notes

  1. Tc: Trailer with cab; Mp: EMU with pantograph; M: EMU without pantograph.

References

  1. "Metro breaks records" (in Chinese). Shanghai Metro. 2019-03-09. Retrieved 2019-03-09.
  2. ExploreMetro Blog: Line 9 gets linked up
  3. "Shanghai Urban Rail Transit recent construction plan (2010-2020)". Retrieved 2015-01-08.
  4. 乘车指南 > Station信息. Shanghai Metro Official Site. Retrieved 2015-12-17. Instructions: 点击相应线路,选择Station,点击"站层图"可查看相应Station的站台结构。
  5. 9号线延伸南段开通 松江老城轨交房130万起. Sina News. 2013-01-30.
  6. "Archived copy" 上海轨交9号线12月29日开通试运营. 新民网. 2007-12-26. Archived from the original on 2016-03-04. Retrieved 2016-07-23.{{cite web}}: CS1 maint: archived copy as title (link)
  7. 9号线宜山路站今日通车. 东方早报. 2008-12-28. Archived from the original on 2016-08-07. Retrieved 2016-07-23.
  8. 上海轨交9号线2期11号线北段1期12月31日开通. Tencent (QQ) News. 2009-12-28.
  9. 4月7日起轨道交通1、9号线徐家汇站实现站内换乘 9号线东端终点站杨高中路站同步开启运营. Shanghai Metro Official Site. 2010-04-04.
  10. Shanghai Shentong Metro Group Co., Ltd. (2017-12-29). Soft Operation of Line 17 (Hongqiao Railway Station – Oriental Land), Phase 3 Project of Line 9 (Mid Yanggao Road - Caolu) on Dec. 30, 2017. Shanghai Metro. Retrieved 2017-12-29.
  11. Public announcement on the special planning of Metro Line 9 (Middle Yanggao Road Station - Caolu Railway Station). 2021-02-14.
This article is issued from Wikipedia. The text is licensed under Creative Commons - Attribution - Sharealike. Additional terms may apply for the media files.