North East MRT line
The North East MRT line (NEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Operated by SBS Transit, it is the shortest MRT line at 20 kilometres (12 mi). The line runs from HarbourFront station in southern Singapore to Punggol station in the northeast, serving 16 stations via Chinatown, Little India, Serangoon and Hougang. Coloured purple on official maps, it is the country's first fully automated underground rail line.
![]() ![]() North East line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Native name | Laluan MRT Timur Laut 东北地铁线 வடக்கு கிழக்கு எம்ஆர்டி வழி | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Status | Operational Under construction (Punggol Coast) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner | Land Transport Authority | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Singapore | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Termini | HarbourFront Punggol Punggol Coast (2024) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 16[lower-alpha 1] 1 (Under construction) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Service | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Type | Rapid transit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Mass Rapid Transit (Singapore) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Services | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator(s) | SBS Transit (ComfortDelGro Corporation) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Depot(s) | Sengkang | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Rolling stock | Alstom Metropolis C751A Alstom Metropolis C751C Alstom Metropolis C851E (Future) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Daily ridership | 230,852 (July 2021)[1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Planned opening | 2024Punggol Coast) | (||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | 20 June 2003 15 January 2006 (Buangkok) 20 June 2011 (Woodleigh) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Technical | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Line length | 20 km (12 mi) (Operational) 1.6 km (0.99 mi) (Under construction) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Character | Fully Underground | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrification | 1,500 V DC from overhead catenary | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operating speed | limit of 90 km/h (56 mph) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The third MRT line in Singapore, the NEL was conceptualised in the 1980s and 1990s. The line was planned to alleviate traffic congestion on the roads leading to the northeast suburbs. The alignment and stations were finalised in 1996. Completed at a cost of S$5 billion, the line began operations on 20 June 2003, with the exception of two stations. Buangkok station opened on 15 January 2006, and Woodleigh station began operations on 20 June 2011. A one-station extension to Punggol Coast station is under construction and expected to be completed in 2024.
Being driverless, the line adopts the moving-block Alstom Urbalis 300 CBTC signalling system. Two rolling stocks supplied by Alstom – C751A and C751C – run the line, and are powered by an overhead catenary system. The NEL also saw the launch of the Art-in-Transit programme, with eighteen artworks displayed across the 16 stations.
History
Conceptualisation and plans

The Mass Rapid Transit Corporation (MRTC) first proposed an additional MRT line serving the northeastern areas of Punggol and Jalan Kayu in September 1984.[2] In its preliminary studies, the Communications Ministry concluded that roads would be insufficient to serve the future housing estates that will be built in the 21st century. To minimise the impact on other developments, plans for the line were developed early to determine the parcels of land needed for the line's construction.[3] In December, a British consultancy team, consisting of Sir William Halcrow and Partners, Merz & McLellan and London Transport International, was appointed to look into possible routes for the line.[4]
In March 1986, the British firm drew up a tentative route from Outram Park to Punggol. The line would interchange with the existing MRT system at Dhoby Ghaut station and pass through Kandang Kerbau and Hougang, paralleling the major roads of Serangoon Road and Upper Serangoon Road. A branch line from Hougang to Jalan Kayu was also proposed. The segment of the line in the city would be underground, while the portion after Braddell Road would be elevated.[5] The MRTC, which approved the project in October,[6] had proposed that the line be linked with Bishan Depot, which would maintain and service trains running on the future line.[7] In February 1991, it was further proposed to extend the line to Pulau Tekong via Pulau Ubin. The extension would serve future residential and industrial developments outlined in the long-term plans for these islands.[8]
Delay in implementation
While the government approved the NEL "in principle" in January 1989, Communications Minister Yeo Ning Hong said the line's construction was dependent on developments in the northeast.[9] The Woodlands line extension,[lower-alpha 2] costing S$1.35 billion (US$0.7 billion), took precedence over the S$4.3 billion (US$2.4 billion) NEL. Yeo's successor, Mah Bow Tan, had explained that, given the low population of the northeast area, it would not be financially viable to build the NEL in lieu of the Woodlands extension.[11] Mah had also earlier explained in 1992 that the Woodlands extension was built because, unlike the northeast, plans were already "firmed up" for developments in Woodlands. Mah said the line would be built when housing developments in the northeast were completed.[12] The four Members of Parliament (MPs) in the northeast, however, called for the line to be built earlier, stating that there would be sufficient demand given the area's population. They also said the MRT line would resolve the area's traffic congestion.[11]
Reviewing the line's feasibility,[13] the Communications Ministry stated in 1995 that if construction on the NEL started promptly, it could be completed in 2002. However, the line was projected to cost S$5 billion (US$3.5 billion) and would operate at a loss of S$250 million (US$176.4 million) during its first four years of operation, with lower daily passenger numbers of 240,000. Nevertheless, the Communications Ministry recommended to the Cabinet that the NEL be constructed, citing "wider benefits" such as enhanced travelling time and reduced reliance on cars for Singaporeans.[14]
There's no question about our desire or willingness to bring this extension forward. I believe it's worth the effort. It's worth doing. I believe residents will show their commitment and willingness to help us bring the gap in operating costs.
– Mah Bow Tan, during his engagement with the grassroots leaders at Punggol Community Club on 22 October 1995.[15]
Due to the line's higher costs and the projected deficit, Mah, in his engagements with the grassroots leaders in October, suggested that the residents would have to be prepared to pay higher fares on the NEL to cover the initial losses. The decision was divisive among the leaders. Some felt it would be unfair for the residents, while others were confident that the residents would be willing "to pay for a better quality of life". Increased fares for the entire network were also suggested, but Mah replied that it would be more difficult to apply such a principle. During the engagements, Mah assured the leaders that the government was willing to bring the line's construction forward and that he would make the recommendation to the government for the line to be constructed.[15][16]
The 1996 White Paper, unveiled on 2 January 1996, outlined that the NEL would be built earlier to address congestion on the northeast corridor, which would also be enhanced by express bus services.[17][18] Shortly after on 19 January, during the debate on the White Paper, the government announced it had decided to build the NEL "immediately", which was met with applause in the Parliament.[19]
Construction and opening

Date | Project | Description |
---|---|---|
20 June 2003 | North East Line | HarbourFront – Punggol (14 stations) |
15 January 2006 | Opening of Buangkok station | |
20 June 2011 | Opening of Woodleigh station | |
2024 | North East Line Extension | Punggol – Punggol Coast (1 station) |
The 16 NEL stations and their locations were announced on 4 March 1996.[20] Many residents and politicians welcomed the announcement, as the line was expected to relieve traffic congestion, improve transport connections in the northeast and stimulate developments around the station sites.[21][22] Thirteen civil contracts for the trackwork and for construction of the stations, Sengkang Depot and associated tunnels were awarded at a total sum of S$2.8 billion (US$1.9 billion). Sixteen more contracts related to electrical and mechanical works were awarded at a total sum of S$1 billion (US$3.5 billion).[23]
To construct the line, 20 ha (49 acres) of private land was acquired, while 43 ha (110 acres) of government land were returned to the State.[20] Several rental HDB blocks, private homes and shophouses had to be acquired,[24] which dismayed many affected residents.[25] Those who had been asked to relocate in July requested more time to seek new premises.[26] Construction of the line began with a groundbreaking ceremony at Farrer Park station on 25 November 1997.[27][28] On 20 May 1999, SBS Transit (then Singapore Bus Service Ltd) was appointed to operate the line along with the Sengkang and Punggol LRT systems. With bus operations in the area handed over from Trans-Island Bus Services (TIBS) to the newly appointed operator, SBS then had control over both bus and rail services in the northeast, allowing the inter-modal integration that the government aimed for.[29][30]
Construction challenges on the line include having to divert the Eu Tong Seng canal into pipes for the construction of Chinatown station[31][32] and having to avoid flooding the tunnels and station while boring the tunnels underneath the Singapore River between the Clarke Quay and Dhoby Ghaut stations.[33] At Outram Park station, to minimise any movement to the East West line (EWL) tunnels, an arch roof of steel pipes filled with cement were laid underneath the EWL tunnels.[34] Jet grout arches were also used to support the North South line (NSL) tunnels when explosives were used to remove the hard rock while tunnelling from Clarke Quay to Dhoby Ghaut.[35] Various roads around the line's route had to be temporarily diverted for the line's construction.[36]
When the 16 stations were announced, Potong Pasir (then named Sennett), Woodleigh and Punggol were not to be built along with the other stations due to the lack of developments around the stations' sites at the time.[37] The timeline for constructing Punggol station was brought forward to serve the upcoming Punggol 21 developments.[38][39] The decision not to build and open Sennett station, however, generated political controversy, with claims by residents and opposition MP Chiam See Tong that the station would only open if the ruling People's Action Party (PAP) secured the constituency.[40][41] In 2002, following a revised study on ridership numbers, the government decided to open the station when the other NEL stations opened, citing projected developments around the site. The station was also given its present name.[42]
The NEL was initially expected to be completed by the end of 2002,[43][44] with various SBS staff being trained on train maintenance and the various technical aspects of the fully automated system.[45] However, the Land Transport Authority (LTA) in September 2002 stated that the line might be opened later, in April 2003, to allow sufficient time for tests on the line.[46] The line's systems were handed over to SBS Transit on 16 December, with the operator carrying out further tests.[47] Due to a glitch in the signalling system, however, the NEL's opening was delayed further to June, with tests briefly being handed over to the LTA.[48] As it had to bear the cost of maintenance and manpower, SBS Transit sought compensation from the government for the delay.[49]
With the exception of two stations (Buangkok and Woodleigh),[50] the NEL commenced operations on 20 June 2003.[51] About 140,000 people visited and took the NEL on its opening day. Many who visited were impressed by the comfort and fast speed of the new line. However, two delays occurred on the opening day. A train, stalled between Boon Keng and Potong Pasir, had to be manually steered to Farrer Park. Another train failed to depart Dhoby Ghaut station, as its sensors mistakenly indicated that a set of doors remained open, and hence was pulled from service.[52] The line's official opening ceremony took place on 28 August.[53]
Though the NEL has seen a few glitches since its opening, it has been very reliable and generally well received by commuters, with operations running smoothly.[54] In July 2003, the International Association of Public Transport heralded the NEL as a model public transport system for the future, with other driverless systems being planned around the world.[55] In June 2004, SBS Transit reported that it had only experienced one 15-minute delay every six weeks, compared to the expected twice-a-week delay.[56]
Opening of reserved stations

On 17 June 2003, operator SBS Transit announced that two stations – Woodleigh and Buangkok – would not open along with the other NEL stations. Due to the lack of developments, the operator said keeping the stations closed would reduce operating costs by S$2–3 million.[57] Residents around the system were upset by the sudden decision to keep Buangkok station closed, but they were assured by MPs and grassroots leaders that the station would be opened.[58][59]
The government initially stood by SBS Transit's decision to keep the station closed, with plans to open the station only in 2006 when there were more residential flats built in the area.[53][60] It was further pushed to 2008, following projections for the housing development plans for the area.[61] With public pressure and after residents promised to use the station,[62] SBS Transit announced at the end of 2005 that it would open the station on 15 January 2006.[63][64]
The station opened "with much fanfare", with various activities, including a walk-a-jog, organised for the opening event.[65][66] Since its opening, however, the station only had 1,386 daily riders on average, as opposed to the expected 6,000 daily riders.[67] Many residents still traveled to the adjacent stations of Sengkang and Hougang due to the amenities around these stations.[68] Nevertheless, SBS Transit, after stating that it was still "too early to draw a conclusion" on the ridership,[67] remained committed to keeping the station open so it could serve future developments nearby.[68]
Woodleigh station, built near the former Bidadari cemetery,[69] was scheduled to be opened about seven or eight years after the rest of the NEL opened.[70][71] In January 2011, The Straits Times reported that preparations for the station's opening had been ongoing since the second half of 2010; the newspaper speculated that the station would open in mid-2011 to serve new developments in the area.[72] In a parliament session in March, Transport Minister Raymond Lim confirmed that Woodleigh station would open on 20 June 2011.[73] On the opening day, however, several commuters alighted at Woodleigh station by accident, having intended to alight at the adjacent Serangoon station and being unaware that Woodleigh had opened. The operator deployed several staff to assist the confused commuters. Other curious commuters alighted to view the station interior or try an alternative route from the station.[74][75]
North East Line extension (NELe)

On 17 January 2013, then-Minister for Transport Lui Tuck Yew announced that it would construct a one-station extension to the NEL to serve the upcoming developments in Punggol North.[76] While it was initially planned to extend the line by 2030,[77][78] then-Second Minister for Transport Ng Chee Meng announced on 7 June 2017 that the 1.6 kilometres (0.99 mi) extension would be accelerated to 2023 in conjunction with development plans for the area.[79][80][81]
The contract for the construction of the extension was awarded in December, and construction began that month.[82][83][84] While tunneling works were completed on 13 November 2020, transport minister Ong Ye Kung announced that Punggol Coast station's completion would be delayed to 2024 due to delays from the COVID-19 pandemic.[85][86]
Network and operations
Services

As of July 2021, the NEL has a daily ridership of 230,852.[1] The NEL generally operates between 5:30 am and 12:30 am daily. On weekdays and Saturdays, the first train on the line departs from the northern terminus Punggol at 5.42 am, while the last train on the line departs from the southern terminus HarbourFront at 11:56 pm.[87] Trains on the NEL run every 2.5 to 5 minutes.[88] The total travel time between the NEL's termini is 32 minutes.[89]
The NEL initially had a higher fare structure compared to the North South and East West lines due to the higher operating costs.[90] On 30 December 2016, however, fares on the NEL were lowered to match the other modes of transport under a "purely distance-based approach". This revision, undertaken following a fare review by the Public Transport Council, was intended to minimise confusion for commuters.[91][92]
The NEL is the first line to be operated by SBS Transit.[30] Since 2018, the NEL has transited into the New Rail Financing Framework (NRFF). Previously, the operator, being the owner of the rail assets, had to bear the full cost for maintaining and upgrading trains and the signalling system. Under the NRFF, the LTA and SBS Transit will share the profits and financial risks in operating the line, with LTA taking control of the operating assets from 1 April. SBS Transit will operate the line under a 15-year license that is set to expire on 31 March 2033.[93]
Route
As the name implies, the fully-underground 20-kilometre (12 mi) North East line runs from Singapore's city centre to the northeastern parts of the island.[94] Beginning at HarbourFront station,[95] the line runs northeast, paralleling the New Bridge Road and Eu Tong Street in Chinatown between Outram Park and Clarke Quay stations.[96] Passing underneath the Singapore River and Fort Canning Hill to Dhoby Ghaut station,[97] the NEL continues north to Little India station, cutting underneath Bukit Timah Road.[98] Following Race Course Road and Serangoon Road through Little India and Boon Keng,[99] it cuts through Whampoa River and Kallang River before reaching Potong Pasir.[100]
Between the Potong Pasir and Kovan stations, the line parallels Upper Serangoon Road before curving north to Hougang station.[101] The line then runs along Hougang Avenue 6 and Sengkang Central to Sengkang station in Sengkang and further extends to Punggol station in Punggol town, where the line terminates.[102] The NEL will continue towards Punggol Coast station in 2024, curving eastward past Punggol.[103]
Stations
The 20-kilometre (12 mi) line serves 16 underground stations from HarbourFront to Punggol. Six of the stations interchange with other MRT lines.[104] It is coloured purple on official maps.[105] Punggol Coast, the seventeenth station on the line, will open in 2024.[106] A reserved station "NE2" between the HarbourFront and Outram Park stations, may be built in the future depending on the developments between the two stations.[107]
Legend
![]() Elevated | ![]() ![]() Line terminus | ![]() Transfer outside paid area |
![]() Ground-level |
![]() Wheelchair accessible |
![]() Bus interchange |
![]() Underground | ![]() Civil Defence Shelter |
![]() ![]() ![]() ![]() ![]() ![]() Other transportation modes |
List
Station code | Station name | Images | Interchange; Adjacent transportation |
Opening |
---|---|---|---|---|
![]() ![]() NE1 CC29 ![]() ![]() ![]() | HarbourFront | ![]() | ![]() ― ![]() ― ![]() ![]() ![]() ![]() ![]() ![]() | 20 June 2003; 18 years ago |
NE2 Infill station ![]() ![]() | TBA | — | TBA | |
NE3 EW16 TE17 ![]() ![]() ![]() | Outram Park | ![]() | ![]() ![]() ― ![]() | 20 June 2003; 18 years ago |
NE4 DT19 ![]() ![]() ![]() | Chinatown | ![]() | ![]() | |
NE5 ![]() ![]() ![]() | Clarke Quay | ![]() | — | |
![]() NE6 NS24 CC1 ![]() ![]() | Dhoby Ghaut | ![]() | ![]() ![]() | |
NE7 DT12 ![]() ![]() ![]() | Little India | ![]() | ![]() | |
NE8 ![]() ![]() ![]() | Farrer Park | ![]() | — | |
NE9 ![]() ![]() ![]() | Boon Keng | ![]() | ||
NE10 ![]() ![]() ![]() | Potong Pasir | ![]() | ||
NE11 ![]() ![]() ![]() | Woodleigh | ![]() | ![]() | 20 June 2011; 10 years ago |
NE12 CC13 ![]() ![]() ![]() | Serangoon | ![]() | ![]() ― ![]() | 20 June 2003; 18 years ago |
NE13 ![]() ![]() ![]() | Kovan | ![]() | — | |
NE14 CR8 ![]() ![]() ![]() | Hougang | ![]() | ![]() ― ![]() | |
NE15 ![]() ![]() ![]() | Buangkok | ![]() | ![]() | 15 January 2006; 16 years ago |
NE16 STC ![]() ![]() | Sengkang | ![]() | ![]() ― ![]() | 20 June 2003; 18 years ago |
NE17 PTC CP4 ![]() ![]() | Punggol | ![]() | ![]() ![]() ― ![]() | |
NEL extension (under construction, to be ready by 2024) | ||||
![]() NE18 ![]() ![]() | Punggol Coast | ![]() | ![]() | 2024; 2 years' time |
Culture
Architecture


.jpg.webp)

The 16 NEL stations have their own unique design that reflects their locations.[109] HarbourFront station, being located by the sea, has a maritime theme with the ship hull elliptical motif used for the ceiling and the concourse openings to the platforms.[110] At Little India station, the metal grills of the station walls have leaf-shaped patterns similar to the door patterns to the Hindu prayer rooms.[109] The station design is intended to reflect Indian traditions.[111]
The NEL station entrances utilise glass that allows natural light into the station during the day.[109] Exit A of Chinatown station features a pavilion-style transparent roof structure which allows natural light into the station and provides an unobstructed view of the shophouses along Pagoda Street.[104][112] At Serangoon, each of the four triangular-shaped entrances is painted with a unique colour and encased in a cubic structure.[94] Unlike the other NEL stations, the entrances of Buangkok station do not employ glass in their design; white Teflon sheets supported by metal frames envelops the entrances.[109]
Dhoby Ghaut station is the largest station on the MRT network.[113] The five-level underground station is also integrated with the twin-towered office complex Atrium@Orchard above the station.[114] The first such integration on the MRT network,[113][115] it allows for more efficient land use while improving access to public transport.[116] The NEL platforms at the station were one of the deepest platform on the network at 28 metres (92 ft) underground.[117]
The four-level Sengkang station[118][119] is an integrated hub with the three modes of transport – MRT, LRT and bus – serving the Sengkang area. The MRT/LRT station was the first intermodal station on the MRT network for all three modes of transport.[120] The simple layout, the spacious interior and transparency in the station design allow easier navigation in and out of the station.[104] Besides the transport facilities, the station is fully integrated with the property developments of Compass Heights and Compass Point by CentrePoint Properties (now Frasers Property).[118][120][121]
Designed by two architectural firms – 3HPArchitects and Farrells[122][123] – Punggol station is intended to be integrated with the LRT station and the bus interchange.[124] The station's curved aluminium and stainless steel cladding gives it a futuristic outlook, best reflecting the developments of Punggol 21.[125][126] As the station spans over Punggol Central at 320 metres (350 yards) to accommodate the bus stops, taxi stands and passenger drop-off points along that road, Punggol station is the longest station on the NEL.[126]
Public artworks
The NEL saw the first launch of the Art-in-Transit (AiT) programme – a showcase that integrates public artwork in the MRT network.[127] Across the 16 stations, 18 artworks by 19 artists are featured.[128] The artists involved were selected through the Art Review Panel, which reviews the artists' portfolios and manages the development of the art concepts.[129] Considered a "significant milestone" for public art in Singapore,[130] the artwork project aims to enhance the commuters' experience when travelling.[127] Unlike previous artworks featured in the original NSEWL stations, the artwork has to be integrated into the station design, while reflecting the history and heritage of the station's locality.[128][131]
Station code | Station name | Artwork name | Artist(s) |
---|---|---|---|
NE1 CC29 | HarbourFront | Engimatic Appearances | Ian Woo |
NE3 EW16 TE17 | Outram Park | Memories | Wang Lu Sheng |
Commuters | Teo Eng Seng | ||
NE4 DT19 | Chinatown | The Phoenix's-Eye Domain | Tan Swie Hian |
NE5 | Clarke Quay | The Reflections | Chua Ek Kay |
NE6 NS24 CC1 | Dhoby Ghaut | Interchange | Milenko and Delia Prvacki |
Universal Language | Sun Yu-Li | ||
NE7 DT12 | Little India | Memoirs of the Past | S. Chandrasekaran |
NE8 | Farrer Park | Rhythmic Exuberance | Poh Siew Wah |
NE9 | Boon Keng | Metamorphosis | Lim Poh Teck |
NE10 | Potong Pasir | Point of View | Matthew Ngui |
NE11 | Woodleigh | Slow Motion | April Ng |
NE12 CC13 | Serangoon | Memories of Childhood | Eng Joo Heng |
NE13 | Kovan | The Trade-off | Eng Tow |
NE14 CR8 | Hougang | Hands Up for Hougang | Seck Yok Ying |
NE15 | Buangkok | Water, Nature & Contemporary | Vincent Leow |
NE16 STC | Sengkang | T.R.A.N.S.I.T.I.O.N.S. | Koh Bee Liang |
NE17 PTC CP4 | Punggol | Water, Landscape & Future | Goh Beng Kwan |
Infrastructure
Rolling stock


The NEL is operated by a fleet of 43 trains manufactured by Alstom.[132] The 25 first-generation Alstom Metropolis trains were supplied under contract C751A,[23][133] while an additional 18 trains were supplied under contract C751C.[134] The C751C trains, a modern version of the first-generation trains,[135] were delivered to Singapore from July 2014.[136] An additional six trains, also manufactured by Alstom, were purchased in April 2018 for the NELe.[137][138] The trains run in a six-car formation[132] and can accommodate 1,920 passengers each.[139]
The trains are fully automatic and controlled by an Operations Control Centre (OCC) at Sengkang Depot. The fleet's brake systems, more efficient than other fleets, allow smoother and quieter braking.[140] Train speeds can reach up to 100 km/h (62 mph).[139] Various safety features are installed, such as Closed Circuit Television Cameras (CCTVs) for monitoring the trains' interiors, and a passenger emergency communication system that allows communication between passengers and the OCC.[140] The trains are spacious with wider seats and dedicated spaces for wheelchair users.[141]
Each train is made of fire-resistant materials, with fire and smoke detectors and a fire barrier underneath the frame.[139] On each train is a pair of beams (rail guards) that detects obstacles in the train's path. While smaller debris could be swept away, the train would automatically stop should the beams detect larger objects.[142] A 1500V Overhead Catenary System (OCS) powers the trains,[lower-alpha 3] the first such electrical system on the MRT network. The OCS allows a safer environment for maintenance workers on the tracks and is cheaper with a smaller conductor.[144] In case of emergencies, when the train is stationary, the doors on both sides can be opened easily and without the need for electricity, with ramps lowering for passenger evacuation into the tunnels.[145][146]
The first-generation trains are undergoing a mid-life refurbishment that began in 2019 and is scheduled for completion in the third quarter of 2024.[133] The upgrades include replacements of interior parts and the installation of a new condition monitoring system that will monitor the train's performance.[147] The first refurbished train entered service on 28 February 2022.[148]
Alongside the passenger trains, the NEL rail tunnels and tracks are maintained by a fleet of engineering trains. The four types of engineering trains are: the locomotive, for towing wagons with equipment; the heavy crane vehicle, for changing tracks; the multi-functional vehicle, for detecting flaws on the rails and tunnel structures; and the rail-grinding machine, for grinding rails "back into shape".[149] These trains are manufactured by Plasser & Theurer, Speno International and Harsco Track Technologies.[150] A new fleet of engineering trains have been supplied by CRRC Zhuzhou Machinery Co Ltd.[151]
Depot

The Sengkang Depot, located along Sengkang East Avenue, is the service and storage area for NEL trains.[152] It is between the Buangkok and Sengkang stations.[153][154] Built by Hyundai Engineering and Construction at S$350 million (US$235.72 million),[155] the 27 ha (67-acre) depot includes the OCC,[156] which monitors the trains' and stations' operations on the line.[157]
The NEL depot can accommodate up to 44 trains.[157] Three additional stabling tracks are being built at the depot for the NELe.[143] The depot also houses LRT trains for the Sengkang and Punggol LRT lines above the NEL depot.[156][158]
The facilities at the depot include the four-storey administrative building, maintenance bays, a workshop and a fully automated warehouse. The depot workshop has equipment that can lift up an entire train for repairs – the first such workshop in Singapore. Utilising the NEL signalling system, train movement in the depot is mostly automatic. Staff members access the area via three dedicated tunnels for safety reasons.[159]
The OCC also controls the equipment and systems of tunnels, stations, power substations and the depot, which are all integrated into one terminal. The systems are managed by four to five rotating teams working 24/7. Alongside a training and software development room, the OCC has a depot control centre to monitor and supervise operations in the depot.[157][160]
Signalling
The NEL is a fully automatic rapid transit line[161] utilising the Urbalis 300 moving-block signalling system provided by Alstom. Automatic Train Control (ATC) for the line is based on Alstom's MASTRIA software, which also manages the Automatic Train Protection (ATP) and Automatic Train Operation (ATO) for the line. The Urbalis system also includes the Computer-based Interlocking system that controls the track switches and interfaces with the ATC and the Data Management System. The DMS oversees the signalling equipment, platform screen doors and trains, monitored by station staff.[139]
The ATP system maintains a buffer between trains that prevents them from getting too close to one another.[162] The minimum distance allowed is 30 metres (98 ft), though the average distance between trains is at least 600 metres (2,000 ft).[142] Using microwave technology, the IAGO waveguide (Informatisation et Automatisation par Guide d’Onde or waveguide transmission line system for computer and automation applications), which allows two-way communication between the trains and the track tubes emitting the microwaves, monitors the trains' positions and movements. If a train were to enter the buffer, the ATP would automatically adjust the train speed accordingly.[162]
At least 500 computer systems control the various aspects of the NEL. Should there be a glitch, backup systems would take over. The system would "go to sleep" should it experience a severe malfunction. In the case of system failure, drivers would be deployed to take manual control over the trains.[146][161] The reliability of the signalling system ensured that the line maintained its "mean kilometres between failures" target of one million train-km (620,000 train-miles). As part of the NEL refurbishment programme announced on 17 December 2018, parts of the power and signalling systems were being renewed, along with the installation of new rail crossings and tracks. These renewal programmes are to ensure the line's continued reliability even as it ages.[147]
Station facilities
Passenger Service Centre (PSC)
Every station has a Passenger Service Centre (PSC) at the concourse.[163] Generally, the PSCs are curvilinear, unlike the more "boxy" designs of other PSCs in older MRT stations.[164] Besides assisting passengers and helping check and top up their fare cards, the PSC monitors and controls the functions in the connecting tunnels. The PSC communicates with the OCC at the depot. When the station is used as a civil defence (CD) shelter, the PSC becomes the Command Centre for the station.[163]
Lifts and escalators
Each of the NEL stations is equipped with "energy-smart" Otis escalators connecting the various levels of the station. When not in use by commuters, their speed is reduced by half, reducing energy consumption and wear and tear. Woodleigh station features one of the longest sets of escalators at 38.5 metres (126 ft). Besides escalators, Dhoby Ghaut station is the first MRT station to feature a set of 55 metres (180 ft) travellators that links between the NEL and NSL platforms.[165]
All the NEL stations have lifts that provide step-free access to the platforms. Most of the lifts have glass doors that not only gives an improved look for the lifts but also enhance the security and safety of users. Each of the lifts has a communication system connected to the station's PSC. In case the lift stalls during a station blackout, a battery-operated power backup will provide lighting and ventilation for the lift car for four hours.[166]
Accessibility

In compliance with the Code on Barrier-Free Accessibility, the NEL stations have wheelchair-friendly facilities.[167] Each station has an entrance allowing barrier-free access via lifts and ramps,[168] in contrast to the older stations on previous lines, which lacked such amenities.[169]
The NEL also features Singapore's first tactile system on the network. Consisting of tiles with rounded or elongated raised studs, the tactile system intends to guide visually impaired commuters through the station, with a dedicated route from the entrance to the platforms.[51][168] The station seats also have armrests to assist those who have difficulties in getting up.[167]
These accessibility features were part of the recommendations from a working group set up by the LTA to improve accessibility on the MRT network. Other associations representing the disabled were also consulted. As the group only completed its findings in 1999, only some of the recommendations were adopted as the stations' infrastructure was already at an advanced stage of construction.[168]
Safety

Full-height Platform Screen Doors (PSDs) supplied by Westinghouse[170] serves as a safety barrier between passengers on the platforms and the trains.[171] The PSDs also enable climate control within the station, minimising the loss of cool air from the platforms and preventing warm air entering the station from the tunnels.[172] A total of 768 doorways were supplied for the 16 stations on the NEL.[170] For Punggol Coast station, the PSDs will be supplied by ST Engineering Electronics Ltd under Contract 852F.[173] The platforms also have Emergency Stop Plungers (ESPs) that will halt the trains in an emergency.[174]
More than 10,000 smoke and heat detectors are installed in all of the NEL stations as part of the line's fire alarm system.[175] The alarm also automatically alerts SBS Transit if there are any faults in the system. The alarm system is integrated with the public announcement system. Hence, instead of alarm bells, there would be pre-recorded messages delivered that would direct commuters for evacuation. Besides the detectors, there are sprinkler and hose reel systems, dry riser pipeworks and an Inergen gas system that will contain the fire spread.[176]
During a fire, the escalators could be shut down remotely from the PSC, with the fare gates opened for evacuation. The air-conditioning system would be shut down to minimise re-circulation of smoke.[177] The "smoke curtain" system, installed in the station, controls the smoke movements. Smoke extraction fans, which are automatically activated, would remove any contained smoke.[172]
Civil Defence

With the exception of three stations (Dhoby Ghaut, Sengkang and Punggol), the NEL stations are designated as Civil Defence (CD) shelters.[178][179] Each of the CD stations is designed to accommodate at least 7,500 people and withstand airstrikes and chemical attacks. Equipment essential for the operations in the CD shelter is mounted on shock absorbers to prevent damage during a bombing. When electrical supply to the shelter is disrupted, there are backup generators to keep operations going.[180]
During emergencies, the large sliding doors would seal the entrances, while the tunnel portals would be sealed by tunnel blast doors.[180] The shelters also have dedicated built-in decontamination chambers and dry toilets with collection bins that will send human waste out of the shelter. These toilets are located next to an exhaust ventilation outlet to prevent the accumulation of smell in the shelter.[181]
Notes and references
Notes
- Excluding reserved station for NE2
- The North South line segment from the Yew Tee to Sembawang stations[10]
- The NELe will use the overhead conductor rail supplied by Siemens instead of the OCS.[143]
References
- "Land Transport DataMall". mytransport.sg. Archived from the original on 21 August 2020. Retrieved 11 December 2020.
- "Study on future north-east line". The Business Times. 26 September 1984. Archived from the original on 23 August 2021. Retrieved 22 August 2021 – via NewspaperSG.
- "Study into MRT north-east line". The Straits Times. 26 September 1984. p. 44. Archived from the original on 25 December 2020. Retrieved 22 August 2021 – via NewspaperSG.
- "British team selected". The Straits Times. 7 December 1984. Archived from the original on 22 August 2021. Retrieved 22 August 2021 – via NewspaperSG.
- "Serangoon and Hougang may be next on MRT line". The Straits Times. 30 March 1986. p. 10. Archived from the original on 25 December 2020. Retrieved 22 August 2021 – via NewspaperSG.
- "MRTC okays extension to Punggol, Jalan Kayu". The Straits Times. 6 October 1987. p. 1. Archived from the original on 25 December 2020. Retrieved 22 August 2021 – via NewspaperSG.
- "Land to be set aside for Punggol extension". The Straits Times. 7 April 1987. p. 1. Archived from the original on 22 August 2021. Retrieved 22 August 2021 – via NewspaperSG.
- "Long term development plans for Tekong and Ubin revealed". The Straits Times. 24 February 1991. p. 16.
- "North-easterly MRT route will depend on demand". The Straits Times. 21 January 1989. p. 20. Archived from the original on 22 August 2021. Retrieved 22 August 2021 – via NewspaperSG.
- "Woodlands MRT line | Infopedia". eresources.nlb.gov.sg. National Library Board. Archived from the original on 1 January 2018. Retrieved 19 September 2017.
- "N-E Line still on the horizon". The Straits Times. 15 May 1993. p. 16.
- "MRT link to N-E when enough people live there". The Straits Times. 16 January 1992. p. 26.
- "MRTC to update its plans for north-east sector, link to airport". The Straits Times. 6 September 1994. p. 18.
- "North East MRT Line to cost up to $5b". The Straits Times. 15 July 1995. p. 2.
- "Govt wants to speed up construction: Mah". The Straits Times. 23 October 1995.
- "Mah's poser: Will users pay more to get it faster?". The Straits Times. 9 October 1995.
- "Govt spells out its vision of top transport system". The Straits Times. 3 January 1996. Retrieved 10 December 2021.
- White paper: A World Class Land Transport System (PDF). Land Transport Authority (LTA). pp. 45–46. Archived (PDF) from the original on 22 August 2021. Retrieved 22 August 2021.
- "Immediate Start for north-east line". The Straits Times. 20 January 1996. p. 1. Retrieved 10 December 2021.
- Leong Chan Teik (5 March 1996). "16 MRT stations for 20-km North-East line". The Straits Times (retrieved from NLB). Retrieved 19 November 2019.
- "Residents in N-E corridor happy with station sites". The Straits Times. 6 March 1996. p. 16.
- "Line a relief to people and boon for commerce". The Straits Times. 6 March 1996.
- "Projects – Rail". LTA. 9 February 2004. Archived from the original on 9 February 2004. Retrieved 23 August 2021.
- Leong 2003, p. 33.
- "They have to move to make way for the MRT line". The Straits Times. 6 March 1996. p. 17.
- "Those moving out first want more time to house-hunt". The Straits Times. 5 July 1996.
- "Speech by Mr Mah Bow Tan, Minister for Communications at the Ground Breaking Ceremony for the NEL 25 Nov 97 at 5.30 pm at Farrer Park Station site (junction of Owen and Race Course Road)". National Archives of Singapore (NAS). 25 November 1997. Archived from the original on 28 June 2021. Retrieved 14 March 2021.
- "Drilling begins for N-E line...at the push of a button". The Straits Times. 26 November 1997. Archived from the original on 28 June 2021. Retrieved 14 March 2021 – via NewspaperSG.
- "SBS to run North-East line Tibs to merge with SMRT". The Straits Times. 21 May 1999. Archived from the original on 6 October 2019. Retrieved 6 October 2019 – via NewspaperSG.
- "Appointment of operator for the North East MRT line". National Archives of Singapore (NAS). 20 May 1999. Archived from the original on 23 November 2019. Retrieved 22 November 2019.
- Leong 2003, p. 64.
- "Chinatown back on track". The Straits Times. 31 May 2002. p. 4.
- Leong 2003, p. 84.
- Leong 2003, p. 52.
- Leong 2003, p. 88.
- "Building of N-E MRT line: Serangoon to see detours; more parking". The Straits Times. 8 February 1998.
- "3 stations identified but will not be built yet". The Straits Times. 5 March 1996. p. 1.
- Leong 2003, p. 189.
- "Punggol MRT station to get an early start". Business Times. 30 March 1998. p. 2.
- "Senett or Potong Pasir: 2 views". The Straits Times. 6 March 1996. p. 17.
- "MRT in Potong Pasir if PAP wins?". The Business Times. 27 October 2001. p. 3.
- "MRT trains to stop at Potong Pasir after all". The Straits Times. 28 February 2002. p. 1.
- "SBS' train chief right on track for new line". The Straits Times. 11 August 2001.
- "North-East Line set to roll on June 20". The Straits Times. 8 June 2003.
- "Staff train hard for opening of N-E line". The Straits Times. 3 June 2002.
- "No rush to open N-E MRT line by year-end". The Straits Times. 8 September 2002.
- "Opening Of North East Line". Ministry of Transport. Archived from the original on 19 September 2020. Retrieved 25 April 2020.
- "N-E line delayed again, to start in May or June". The Straits Times. 21 March 2003. p. 7.
- "SBS seeks govt compensation over N-E line delay". The Straits Times. 20 March 2003. p. 22.
- "Two of 16 NEL stations won't open on debut". The Business Times. 18 June 2003. p. 2.
- "North East Line Opens for Passenger Service!". LTA. 20 June 2003. Archived from the original on 3 December 2007.
- "It's a smooth ride on NEL – mostly". The Straits Times. 21 June 2003. p. 1.
Minor hitches aside, the North-East Line got off to a smooth start yesterday
- "Speech By Deputy Prime Minister Mr Lee Hsien Loong At The Official Opening Of The North East Line And Sengkang LRT System on 28 August 2003". Ministry of Transport. Archived from the original on 10 September 2020. Retrieved 25 April 2020.
- "North-East Line gets good scorecard for first 70 days". The Straits Times. 3 September 2003.
- "NEL hailed by world body as model for public transport". The Straits Times. 5 July 2003.
- "Year-end NEL did better than expected". The Straits Times. 18 June 2004.
- "Two of 16 NEL stations won't open on debut". The Business Times. 18 June 2003.
- "Buangkok MRT delay frustrates commuters". The Straits Times. 18 June 2003.
- "Buangkok station may open in three years". The Straits Times. 29 August 2003.
- "SBS Transit 'made mistakes' over Buangkok station". The Straits Times. 15 August 2003.
- "LTA needs a few months for Buangkok review". The Straits Times. 20 September 2005.
- Loo, Serene; Leow, Joanne (27 July 2005). "Residents willing to walk over 400 metres to Buangkok station: survey". Channel NewsAsia. Archived from the original on 1 December 2005.
- "Buangkok station to open on Jan 15". Today. 30 December 2005.
- Zahara, Rita (1 January 2006). "Buangkok MRT station to open on January 15". Channel NewsAsia. Archived from the original on 1 January 2006. Retrieved 25 August 2021.
- "Buangkok NEL Station Commences Revenue Service Amid Great Fanfare". SBS Transit. 15 January 2006. Archived from the original on 29 August 2019. Retrieved 29 August 2019.
- "All aboard at 'white elephant' station". The Straits Times. 16 January 2006.
- "Poor Buangkok MRT ridership since opening". The Straits Times. 24 January 2006.
- "Aiyoh, so creepy at night". The New Paper. 23 February 2006.
- "All aboard for Woodleigh train stop". The Straits Times. 11 June 2011.
- "Closed MRT station running up power bill". The Straits Times. 14 July 2003.
- "Buangkok, Woodleigh closed until...". Today. 14 July 2003.
- "Woodleigh station may open by June". The Straits Times. 22 January 2011.
- "Plans to ramp up rail capacity on fast track". The Straits Times. 9 March 2011.
- "Woodleigh MRT station finally opens – to some confusion". The Straits Times. 21 June 2011.
- "Train finally arrives at Woodleigh MRT station". Channel NewsAsia. 20 June 2011. Archived from the original on 4 May 2012. Retrieved 11 May 2012.
- "Speech by Mr Lui Tuck Yew at visit to DTL1 Chinatown Station on 17 January 2013". Ministry of Transport. 17 January 2013. Archived from the original on 26 February 2020. Retrieved 19 September 2019.
- "Two New Rail Lines and Three New Extensions to Expand Rail Network by 2030". LTA. 17 January 2013. Archived from the original on 6 July 2014.
- "Annex: New Lines and Extensions" (PDF). LTA. Archived from the original (PDF) on 6 July 2014.
- "New train station in Punggol North by 2023". Channel NewsAsia. 7 June 2017. Archived from the original on 7 June 2017. Retrieved 7 June 2017.
- "North-East Line extension serving Punggol North to open in 2023 instead of 2030; to cater to developments in the Punggol area". The Straits Times. 7 June 2017. Archived from the original on 11 June 2017. Retrieved 28 October 2017.
- "Upcoming Projects – Rail Expansion – North East Line Extension". Land Transport Authority. Archived from the original on 1 May 2020. Retrieved 15 May 2020.
- "LTA | News Room | News Releases | LTA Awards Contract for the Construction of Tunnels for North East Line Extension". www.lta.gov.sg. 8 December 2017. Archived from the original on 7 March 2020. Retrieved 7 March 2020.
- "North-East Line extension: LTA awards S$79m contract to China State Construction Engineering". Channel NewsAsia. 8 December 2017. Archived from the original on 7 March 2020.
- Abdullah, Zhaki (8 December 2017). "China State Construction Engineering wins $79m contract for North-East Line extension tunnels". The Straits Times. Retrieved 16 November 2021.
- Yong, Clement (13 November 2020). "Punggol Coast MRT station ready by 2024, 40% of work completed". The Straits Times. Archived from the original on 13 November 2020. Retrieved 13 November 2020.
- Abdullah, Zhaki (13 November 2020). "Opening of new Punggol Coast MRT station to be delayed to 2024". Channel NewsAsia. Archived from the original on 15 November 2020. Retrieved 15 November 2020.
- "First Train/ Last Train". SBS Transit. 2 June 2020. Archived from the original on 28 November 2019. Retrieved 25 August 2021.
- "Transport Tools – MRT/LRT". LTA. 6 May 2020. Archived from the original on 1 November 2019. Retrieved 19 June 2020.
- "Travel Time". SBS Transit. Archived from the original on 20 October 2007.
- "No Revision To Bus And Train Fares And New NEL Fare Structure Approved". Ministry of Transport. Archived from the original on 19 September 2020. Retrieved 26 April 2020.
- "Public transport fares may be standardised". The Straits Times. 10 October 2016. Archived from the original on 6 April 2019. Retrieved 6 April 2019.
- "PTC reduces bus and rail fares". PTC. 26 October 2016. Archived from the original on 27 August 2021. Retrieved 27 August 2021.
- "North East Line, Sengkang LRT and Punggol LRT to Transit to the New Rail Financing Framework: Completion of the Transition of All Existing Rail Lines, Benefitting Commuters". LTA. 14 February 2018. Archived from the original on 29 August 2021. Retrieved 29 August 2021.
- "North East Line". LTA. Archived from the original on 28 August 2017. Retrieved 22 June 2017.
- Google (15 May 2020). "HarbourFront station" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "NEL underneath New Bridge Road" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "NEL underneath Singapore River and Fort Canning Hill" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "Little India station" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "Race Course Road and Serangoon" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "NEL underneath Whampoa River and Kallang River" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "NEL under Upper Serangoon Road" (Map). Google Maps. Google. Retrieved 15 May 2020.
- Google (15 May 2020). "NEL from Hougang to Punggol" (Map). Google Maps. Google. Retrieved 15 May 2020.
- "Alignment of NELe and tunnels between Punggol and Punggol Coast stations" (PDF). LTA. Archived (PDF) from the original on 25 August 2021. Retrieved 25 August 2021.
- "North East Line". LTA. 29 July 2020. Archived from the original on 1 November 2019. Retrieved 27 August 2021.
- "MRT System Map" (PDF). LTA. Archived (PDF) from the original on 21 August 2020.
- "Future System Map" (PDF). Land Transit Authority of Singapore. Archived from the original (PDF) on 9 September 2020. Retrieved 9 September 2020.
- "Why no station between NE1, NE3". The Straits Times. 30 July 2003. p. 17.
- "LTA 2040 Land Transport Master Plan" (PDF). Land Transport Authority. Retrieved 27 May 2019.
- "Local flavour for stops along N-E line". The Straits Times. 7 August 2002.
- Leong 2003, p. 45.
- Leong 2003, p. 115.
- Leong 2003, p. 72.
- "Dhoby Ghaut MRT Station". SAA. Archived from the original on 3 September 2018. Retrieved 12 September 2017.
- "5 underground levels for new Dhoby Ghaut station". The Straits Times. 12 August 1997.
- "North East Line: Dhoby Ghaut Station". LTA. Archived from the original on 4 July 2006. Retrieved 23 September 2020.
- "Topping-Out Of Commercial Development Above Dhoby Ghaut MRT Station". LTA. 12 April 2001. Archived from the original on 23 April 2010.
- "Photo Gallery – Integrated Developments and Interchange Stations". LTA. Archived from the original on 8 December 2011.
- "North East Line: Sengkang Station". LTA. Archived from the original on 3 December 2007. Retrieved 2 October 2020.
- "North East Line: Sengkang Station (page 2)". LTA. Archived from the original on 3 December 2007. Retrieved 2 October 2020.
- Leong 2003, p. 183.
- "Compass Heights". Frasers Property. Archived from the original on 2 October 2020. Retrieved 7 August 2020.
- Tan 2003, p. 179.
- "Punggol Station". Farrells. 19 July 2017. Archived from the original on 21 December 2020. Retrieved 21 December 2020.
- "North East Line: Punggol Station". LTA. Archived from the original on 3 December 2007. Retrieved 21 December 2020.
- "North East Line: Punggol Station". LTA. Archived from the original on 3 December 2007. Retrieved 21 December 2020.
- Leong 2003, p. 194.
- "Art in Transit". LTA. 26 October 2020. Archived from the original on 21 April 2020. Retrieved 25 January 2021.
- "Speech by Mr Khaw Boon Wan at the launch of the North East Line Art In Transit Programme on 6 June 2003". Ministry of Transport. Archived from the original on 10 September 2020. Retrieved 25 April 2020.
- Tan 2003, p. 16, 18.
- Tan 2003, p. 172.
- Tan 2003, p. 14–15.
- "Alstom in Singapore" (PDF). Alstom. 8 December 2019. Archived from the original (PDF) on 8 December 2019. Retrieved 8 December 2019.
- "Joint News Release by the Land Transport Authority (LTA) & SBS Transit - Enhancement Works for the North East Line to Commence in 2019". LTA. 17 December 2018. Archived from the original on 27 August 2021. Retrieved 27 August 2021.
- "LTA and SMRT Award Contracts for New Trains and Re-Signalling Project". LTA. 1 February 2012. Archived from the original on 29 September 2013. Retrieved 16 November 2013.
- "Alstom to supply 34 Metropolis trains and signaling upgrade to Singapore metro". Alstom. 3 February 2012. Archived from the original on 31 December 2013. Retrieved 16 November 2013.
- "From Next Year - Shorter Waits and More Comfortable Rides on Circle Line and North East Line". LTA. 23 July 2014. Archived from the original on 27 August 2021. Retrieved 27 August 2021.
- Lim, Adrian (30 April 2018). "Alstom to supply 17 new MRT trains for North East Line and Circle Line". The Straits Times. Retrieved 16 November 2021.
- "Alstom to supply 17 additional Metropolis trains for Singapore Circle Line and North East Line". The French Chamber of Commerce in Singapore. Archived from the original on 9 August 2018. Retrieved 9 August 2018.
- "Singapore Northeast Line" (PDF). Alstom. Archived from the original (PDF) on 18 February 2012. Retrieved 27 August 2021.
- "Too smart to need driver". Today. 31 March 2001.
- Leong 2003, p. 231.
- "Driverless MRT trains on new line will be safe". The Straits Times. 20 November 2002.
- Tan, Christopher (11 February 2019). "Siemens lands $111m deal to supply power systems for 2 MRT extensions". The Straits Times. Archived from the original on 27 August 2021. Retrieved 27 August 2021.
- Leong 2003, p. 242–243.
- Leong 2003, p. 229.
- "N-E Line driverless, but many eyes keep watch". The Straits Times. 24 February 2003.
- Lim, Adrian (17 December 2018). "North East Line to undergo major renewal project next year". The Straits Times. Archived from the original on 27 August 2021. Retrieved 27 August 2021.
- Kok, Yufeng (27 February 2022). "Refurbished North East Line train to enter service from Feb 28; first of 25 to get mid-life upgrade". The Straits Times. Retrieved 28 February 2022.
- "We call them yellow submarines". The Straits Times. 8 June 2003.
- "MFV keeps NEL under surveillance". Railway Gazette International. 1 July 2003. Archived from the original on 27 August 2021. Retrieved 27 August 2021.
- "C838B型内燃电力地铁工程车的燃油箱设计_参考网". 过期杂志阅读平台_参考网 (in Chinese). 16 November 2020. Retrieved 10 January 2022.
- Leong 2003, p. 199.
- Leong 2003, p. 185.
- Google (15 May 2020). "Sengkang Depot" (Map). Google Maps. Google. Retrieved 15 May 2020.
- "LTA awards 5 more contracts for N-E MRT line". The Straits Times. 27 July 1997. p. 34.
- Leong 2003, p. 201.
- Leong 2003, p. 207.
- "New Two-car Trains for Sengkang-Punggol LRT". LTA. 5 February 2021. Archived from the original on 28 August 2021. Retrieved 28 August 2021.
- Leong 2003, p. 202–204.
- "I saw this baby through its birth". The Straits Times. 8 June 2003.
- "Who's driving the train?". The Straits Times. 16 April 2003.
- Leong 2003, p. 226.
- Leong 2003, p. 216.
- Leong 2003, p. 217.
- Leong 2003, p. 210.
- Leong 2003, p. 213.
- Leong 2003, p. 250.
- Leong 2003, p. 248.
- "More MRT stops ready for disabled". The Straits Times. 24 December 2002. p. 1.
- "Platform Screen Doors: North East Line". Westinghouse Platform Screen Doors. 15 July 2007. Archived from the original on 15 July 2007. Retrieved 27 August 2021.
- "Platform Screen Doors: What are PSDs". Westinghouse Platform Screen Doors. 7 July 2007. Archived from the original on 7 July 2007. Retrieved 3 September 2021.
- Leong 2003, p. 239.
- "Annual Report 2018/19" (PDF). LTA. p. 61. Archived (PDF) from the original on 20 December 2020. Retrieved 3 September 2021.
- Leong 2003, p. 219.
- Leong 2003, p. 234.
- Leong 2003, p. 236.
- Leong 2003, p. 237.
- "Chemical attack? Clean-up at N-E line". The Straits Times. 14 February 2003.
- "List of Public CD shelters as of 31 Dec 2019" (PDF). SCDF. Archived (PDF) from the original on 3 September 2021. Retrieved 3 September 2021.
- Leong 2003, p. 253.
- "Fancy that, dry toilets grab most interest". The Straits Times. 16 February 2003. p. 21.
External links
Media related to Mass Rapid Transit (Singapore) North East Line at Wikimedia Commons
- North East Line
- North East Line (SBS Transit)