Chongming line
The Chongming line (Chinese: 崇明线; pinyin: Chóngmíng xiàn) is a rapid transit line on the Shanghai Metro that is part of the 2018–2023 Shanghai Metro plan.[2] The Chongming line was previously treated as the last phase of Line 9, and was Line 19 until 2016, when it was renamed the Chongming line.
| Chongming line | |||
|---|---|---|---|
| Chongming | |||
| Overview | |||
| Status | Under construction | ||
| Locale | Pudong, Chongming District Shanghai | ||
| Termini | Jinji Road Yu'an | ||
| Connecting lines | 9 12 | ||
| Stations | 8 | ||
| Website | www | ||
| Service | |||
| Type | |||
| System | |||
| Rolling stock | Type A 6-car trains (city area express)[1] | ||
| History | |||
| Commenced | March 29, 2021 | ||
| Planned opening | 2025 | ||
| Technical | |||
| Line length | 42.8 km (27 mi) | ||
| Character | Underground and one station at-grade (Yu'an) | ||
| Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
| Electrification | Overhead lines (1500 volts) | ||
| Operating speed | 120 km/h (75 mph)[1] | ||
| |||
The Chongming line will start at Jinji Road in Pudong and end at Yu'an in Chongming District,[3] and will interchange with Lines 9 and 12.[3] It will be 42.8 kilometres (26.6 mi) long, including a 40.7-kilometre (25.3 mi) underground section.
The phase I construction is expected to be opened at the end of 2025. The phase I start at Jinji Road in Pudong and end at Changxing Island in Chongming District, is 22.4 kilometers long, all of which are underground, with 5 stations and 1 vehicle base.
Planned stations
Station names according to an April 2019 planning document.[3]
| Station name | Connections | Distance km |
Location | ||
|---|---|---|---|---|---|
| English | Chinese | ||||
| Jinji Road | 金吉路 | 9 | Pudong | ||
| Shenjiang Road | 申江路 | 12 | |||
| Gaobao Road | 高宝路 | ||||
| North Lingkong Road | 凌空北路 | ||||
| Changxing Island | 长兴岛 | Chongming District | |||
| Chenjia Town | 陈家镇 | ||||
| Dongtan | 东滩 | ||||
| Yu'an | 裕安 | ||||
References
- "上海市轨道交通崇明线工程环境影响评价咨询项目招标公告". 2019-05-27. Archived from the original on 2019-05-27. Retrieved 2019-09-15.
- "国家发展改革委关于上海市城市轨道交通第三期建设规划(2018~2023年)的批复". Archived from the original on 2018-12-19. Retrieved 2018-12-19.
- "上海市轨道交通崇明线选线专项规划(草案公示)" (PDF). Archived (PDF) from the original on 2019-04-27. Retrieved 2019-04-27.
